Active Projects
Parkside on the River Phase 3 Sections 4, 7A and 7B
Infrastructure
Post-Bid
TX
Parkside Peninsula Sections 1 and 2 -Street Excavation and Drainage, Water, Wastewater, and Erosion Control Improvements
Infrastructure
Post-Bid
TX
Parkside on the River Phase 3, Section 3A and 3B
Infrastructure
Post-Bid
TX
Parkside on the River Phase 3, Section 2
Water Oak North Section 6
Parkside on the River Phase 1A Mud Masonry Wall
RM 2243 Intersection Improvements