Similar Projects
Baycare Health System - Plant City
New Construction - 85,000 SF
Conception
$326,000,000 est. value
Plant City, FL 33565

Armenia Medical Office
Renovation - 4,133 SF
Conception
Tampa, FL 33609

Heartland Dental
Build-Out - 4,250 SF
Post-Bid
Lutz, FL 33559

Tampa Family Health Centers
Renovation, Addition - 4,564 SF
Post-Bid
Lutz, FL 33548

USF Wellness Center Complex Phase 1
New Construction - 47,067 SF
Construction
Less than $20,000,000 est. value
Tampa, FL

Cora Physical Therapy
Build-Out - 2,000 SF
Construction
$100,000 est. value
Riverview, FL 33569

German American Club
Addition - 14,160 SF
Pending Verification
Tampa, FL 33602

Moffitt Cancer Center / Ruskin
New Construction, Infrastructure - 85,000 SF
Pending Verification
$76,000,000 CJ est. value
Ruskin, FL 33570

New Adult Day Health Services Center - South County - C77854000 - Hillsborough County
New Construction, Infrastructure
Conception
$3,230,000 CJ est. value
Tampa, FL 33602

Southshore Plaza
Renovation - 25,200 SF
Post-Bid
$1,000,000 est. value
Wimauma, FL 33598

Heartland Dental
Build-Out - 4,230 SF
Construction
Lithia, FL 33547

CSL Plasma Center
Renovation - 14,884 SF
Post-Bid
Tampa, FL 33612

Medical Office Building - Shell
New Construction - 4,550 SF
Construction
$500,000 est. value
Apollo Beach, FL 33570

Sage Dental / Brandon
Demolition, Build-out - 3,200 SF
Post-Bid
$300,000 CJ est. value
Brandon, FL 33511

AdventHealth
New Construction - 100,000 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Riverview, FL

Last Updated 12/08/2022 01:34 PM
Project Title

Walmart Health Clinic / Plant City

Physical Address View project details and contacts
City, State (County) Plant City, FL 33566   (Hillsborough County)
Category(s) Medical
Sub-Category(s) Medical Office/Outpatient
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a new health center at an existing Walmart store. As of December 8, 2022, planning is underway. A general contractor has been selected and although a firm construction timeline has not yet been determined, construction will most likely begin first or second quarter 2023. *The square footage is approximate and based upon previous locations. *Absolutely no inquiries will be accepted at this time. Unsolicited inquiries may result in disqualification in any future bidding opportunities. *The contact(s) will not accept phone call inquiries at this time.

Details

1 Story Above Grade, 6,500 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Wall Coverings, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Seating.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents