Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Cardiff Row - Phase 2
New Construction
Conception
Cincinnati, OH 45209

RFQ Design - Architect/Engineering Services for the Design of CDC/NIOSH Consolidated Cincinnati Research Facilities, Cincinnati, OH
Demolition, New Construction, Infrastructure - 235,000 SF
Design
$100,000,000 CJ est. value
Cincinnati, OH 45206

2022 Sidewalk Repair/Replacement Program
Infrastructure
Design
$59,049 CJ est. value
Cincinnati, OH 45202

US 42 - Bridge Repair
Infrastructure
Bidding
$1,661,000 CJ est. value
Cincinnati, OH 45229

Parking Lot Milling and Asphalt Installation
Infrastructure
Bidding
$99,000 CJ est. value
Harrison, OH 45030

Demolition and Site Restoration of 3506 Linwood Avenue
Demolition, Infrastructure
Sub-Bidding
$400,000 CJ est. value
Cincinnati, OH 45226

Sewer Backup (SBU) Cleaning Services
Term Contract
Sub-Bidding
Cincinnati, OH 45202

Development Proposals for Real Property
Term Contract
Post-Bid
Cincinnati, OH

Redevelopment of 31 Garfield Place
Infrastructure
Post-Bid
Cincinnati, OH 45202

800 Broadway City Water Main Replacement
Results
$86,000 est. value
Cincinnati, OH 45202

Bigelow, Walker, Auburn Water Main Replacement
Results
OH 45219

Montgomery Quarter
New Construction - 192,000 SF
Construction
$150,000,000 est. value
Montgomery, OH 45242

Montgomery Quarter - Public Site Improvements - Sequence 3
Construction
$5,200,000 est. value
Cincinnati, OH 45242

Twin Lakes Villa Homes
New Construction, Infrastructure
Pending Verification
$9,500,000 CJ est. value
Montgomery, OH 45242

Last Updated 08/06/2022 05:02 PM
Project Title

Ault Park Large Diameter Main Sewer Rehabilitation Program

Physical Address View project details and contacts
City, State (County) Cincinnati, OH 45208   (Hamilton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Ault Park Large Diameter Main Sewer Rehabilitation CMC 321-24 All work shall be performed and materials furnished in accordance with the following specifications: (1) Detailed Specifications or Special Provisions as provided with the bid documents. Videos of pipe segments are to be viewed for bid preparation and are available by request. Please contact our front desk guard, John Konerman, at 513-352-4204 to schedule pick up of Hard Drives with location information. His hours are from 7:30-3:30 pm Monday-Friday. In addition, the following link and login needs to be provided for contractors to readily find locations on ArcGIS: MSD WWC 2022 Ault Park Large Diameter Gravity Main Rehabilitation and CCTV Inspection https://cincywater.maps.arcgis.com/apps/webappviewer/index.htmlid=c3fec3b405b448 fa89d3b5c50ed9feb9 login user name: everyone_contract password: Contract2022

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents