Similar Projects
Memphis Riverfront Tom Lee Park
New Construction, Renovation
Design
Memphis, TN 38103

Nashville District Bank Stabilization MATOC
Infrastructure
Design
$250,000 to $3,500,000 est. value
Nashville, TN

Fox Hill Circle East Drainage Repairs
Infrastructure
Bidding
Germantown, TN 38139

Oakland Sports Park - Phase 1
Renovation
Bidding
Oakland, TN 38060

Montague Park Development
Post-Bid
Chattanooga, TN

Replacement of Culvert on Hickman Lane
Post-Bid
Graysville, TN 37338

Summit Softball Complex Improvements Replace Foul Poles
Results
Less than $54,400 est. value
Ooltewah, TN 37363

Summit Softball Complex Improvements Replace Shade Structure
Results
Less than $48,887 est. value
Chattanooga, TN 37402

Brother Boulevard and Yale Road Resurfacing
Infrastructure
Bidding
Bartlett, TN 38133

Cold Creek Chute Outlet Stabilization
Post-Bid
TN 38041

Signal Mountain High School Track Drainage Improvements
Results
Signal Mountain, TN 37377

Fairview Elementary School and Westwood Elementary School Drainage Improvements
Infrastructure
Bidding
Fairview, TN 37062

Children's Memory Garden
Post-Bid
Nashville, TN 37203

The Grading, Drainage, Construction of A Retaining Wall, Signals and Paving on U.S. 41A (S.R. 15) at University Avenue (L.M. 27.88)
Results
Sewanee, TN 37375

Practice Field Grading Services (12) Locations
Infrastructure
Bidding
TN

Last Updated 01/05/2022 12:57 PM
Project Title

South Northshore Greenway Phase 1B

Physical Address View project details and contacts
City, State (County) Knoxville, TN   (Knox County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of approximately 400 linear feet of asphalt greenway, 550 linear feet of elevated boardwalk, grading, striping and erosion control for the proposed Phase 1B of the South Northshore Greenway.

Details

Park/Playground, Renovation.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents