Similar Projects
Reunion Ridge Filing No. 1 District Improvements
Post-Bid
Less than $13,000,000 est. value
Centennial, CO

Arapahoe County Justice Center West Employee Parking Lot Slope Stabilization and Full Depth Reclamation
Post-Bid
Centennial, CO 80112

Orchard Road Trail
Results
$350,000 to $400,000 est. value
Centennial, CO 80112

Ramp Safety Improvements at the Southbound I-225 at Parker Road
Results
$1,000,000 to $5,000,000 est. value
CO

Arapahoe County Covered Walkways
Post-Bid
Centennial, Littleton, CO 80120

Englewood Recreation Center Water Main, Fire Hydrant Assembly and ADA Ramp Installation
Results
Englewood, CO 80110

Chenango Park Trail Reconstruction
Infrastructure
Post-Bid
Greenwood Village, CO

University Boulevard (SH177) Sidewalk Infill
Results
Greenwood Village, CO 80112

Signal Replacement with Curb Ramps and Minor Signing and Striping
Results
$1,000,000 to $5,000,000 est. value

2020 Concrete Catch-Up Program
Results
Less than $420,891 est. value
Centennial, CO

2019 CDBG Shepperd Avenue Project
Results
Less than $323,333 est. value
Littleton, CO 80120

Ada Curb Ramp Upgrades
Results
$1,000,000 to $5,000,000 est. value

Lone Creek Regional Trail Phase 1A
Results
Less than $1,004,305 est. value
Centennial, CO 80112

Greenwood Gulch Undercrossing Improvements
Results
Greenwood Village, CO

Englewood Service Center Drainage and Parking Lot Improvements
Results
Less than $500,000 est. value
Englewood, CO

Last Updated 07/01/2021 10:46 AM
Project Title

Greenwood Gulch Undercrossing

Physical Address View project details and contacts
City, State (County) Centennial, CO 80111   (Arapahoe County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000 to $350,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of the project includes the construction of a grouted boulder drop structure, riprap revetment, a concrete structural channel under the bridge, a concrete pedestrian trail, and lighting under the bridge for the pedestrian trail.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents