Similar Projects
Last Updated | 05/20/2022 06:12 AM |
Project Title | Shoulder and Slope Rehabilitation |
Physical Address | View project details and contacts |
City, State (County) | PA (Somerset County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction, Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Provides For The Resurfacing Of The Turnpike Eastbound And Westbound Median And Shoulders. Work Will Also Include Shoulder Reconstruction, Guide Rail Replacement, Drainage Channel Reconstruction, And Replacement Of Inlets Including Type a Inlets With New Inlets, And Drain Pipes. Additional Work Includes Access Ramps, Moment Slab, Installation Of Gabion Basket Slope Remediation, Rock Armor, And Maintenance And Protection Of Traffic. Work Items Include, But Are Not Limited To: 6,282 Cy Excavation, Various Class 72,625 Sy Milling Of Existing Asphalt Pavement, Various Depths 8,686 Ton Superpave Asphalt Mixture Design, Wearing Course, 2” Depth 1,512 Ton Superpave Asphalt Mixture Design, Binder Course, Various Depths 1,040 Ton Rich Bottom Superpave Asphalt Mixture Design, Base Course 3,725 Lf Type 31-s Guide Rail 5,715 Cy Rock Armor, Modified, Rock Armor, Modified, With Toe Key 4,066 Cy Rock Blanket 8,544 Sy Shoulder Backup 2,144 Ton Subbase (No. 2a), And Subbase Under Guiderail 25 Each Inlets, Various Conditions |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |