Similar Projects
US Cellular Center Mechanical/HVAC Renovation
Post-Bid
Asheville, NC

Central Campus Electrical Upgrade Phase 2 Distribution
Post-Bid
$6,000,000 est. value
Raleigh, NC 27607

Annual Construction Service Contract for Underground Distribution Construction
Term Contract
Results
Less than $1,000,000 est. value
Fayetteville, NC

56--Upgrade OA & Exhaust Fans Phase II(VA-19-00005148)
Demolition
Results
$500,000 to $1,000,000 est. value
Durham, NC 27705

High Point Parking Deck Lighting Replacement
Post-Bid
High Point, NC 27260

34.5-12.47/7.2 kV Substation Switching Facilities and Accessories
Results
Washington, NC

Detention Center Switchgear Upgrades
Post-Bid
Castle Hayne, NC 28429

Electrical Services
Results
Charlotte, NC

Booker Dairy Road North Feeder New Overhead Addition
Addition
Post-Bid
Smithfield, NC 27577

Frank Porter Graham Elementary School - Intermediate & Media Buildings Hvac Replacement
Results
Chapel Hill, NC

115 kV - 24.94/14.4 kV Substation Switching Facilities
Post-Bid
Statesville, NC

Brinkley Building Cosmetology HVAC Upgrades
Results
Thomasville, NC

HVAC Replacements
Post-Bid
Salisbury, NC

Taxiway Lighting and Signage
Results
Less than $743,576 est. value
Gastonia, NC 28056

Replacement Emergency Generator
Post-Bid
Kinston, NC 28502

Reported 04/14/2020 12:00 AM
Project Title

Design-Build Services for LED Lighting and HVAC Control Infrastructure Improvement

Physical Address View project details and contacts
City, State (County) Statesville, NC 28677   (Iredell County)
Category(s) Single Trades
Sub-Category(s) Electric, HVAC
Contracting Method Design-Build. Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value $10,000,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The design and implementation of LED lighting and HVAC controls as well as any retro commissioning necessary. The project includes 18 elementary schools, 9 middle schools, 9 high schools and 7 administration/auxiliary buildings, which will impact 22,600 individuals district-wide.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents