Similar Projects
Last Updated | 08/23/2021 03:09 PM |
Project Title | SB1 Road Maintenance Projects at Various Locations, FY 2020-2021 |
Physical Address | View project details and contacts |
City, State (County) | Hollister, CA (San Benito County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project includes but is not limited to improvements of Carr Avenue by 0.75 feet Full Depth Reclamation - Cement with a 0.20' HMA Overlay, Shoulder Backing, roadway excavation, clearing and grubbing, HMA dike, and edge protection. Improvements to Anzar Road and Cienega Road includes but is not limited to 1.20 feet Full Depth Reclamation - Cement with a 0.20' HMA Overlay, Shoulder Backing, roadway excavation, clearing and grubbing, HMA dike, and edge protection. Improvements to Cienega Road Extension includes but is not limited to Double CAPE Seal (two Chip Seal layers followed by Slurry Seal) and replace asphalt concrete surfacing |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |