Similar Projects
Calacas Tacos & Beer
Build-Out - 5,500 SF
Design
$200,000 est. value
Edinburg, TX 78541

Calacas Tacos & Beer / Pharr
Renovation - 5,500 SF
Design
$850,000 CJ est. value
Pharr, TX 78577

Dutch Bros TX5901 / Weslaco
New Construction, Infrastructure - 950 SF
Bidding
$750,000 CJ est. value
Weslaco, TX 78596

Crumbl Cookies
Build-Out
Post-Bid
Mission, TX 78573

Plaza San Juan
New Construction
Post-Bid
San Juan, TX 78589

Trenching and Boring Services for Installation of Traffic Signal Electrical Conduit
Term Contract
Results
McAllen, TX

Regional Center for Public Safety Excellence Site Improvements and Leveling for Portable Buildings
Infrastructure
Results
McAllen, TX

Habitat At Grove Apartments
New Construction, Infrastructure - 130,000 SF
Construction
$14,000,000 CJ est. value
McAllen, TX 78501

Whataburger
Renovation - 3,018 SF
Construction
McAllen, TX 78504

Quick Quack Car Wash / Donna
New Construction, Infrastructure - 4,189 SF
Pending Verification
$500,000 CJ est. value
Donna, TX 78537

7 Eleven / McAllen
New Construction, Infrastructure - 4,754 SF
Pending Verification
$1,640,000 CJ est. value
McAllen, TX 78501

Chick-fil-A #3556
Renovation - 1,900 SF
Design
$385,000 est. value
McAllen, TX 78504

Starbucks - Shell Building
New Construction - 2,016 SF
Post-Bid
$500,000 to $1,000,000 CJ est. value
San Juan, TX 78589

Weslaco Fire and Police Stations Off Site Improvements
Infrastructure
Results
Weslaco, TX 78596

Starbucks - Shell Building
New Construction - 2,200 SF
Construction
$800,000 est. value
Weslaco, TX 78599

Last Updated 12/20/2022 11:35 AM
Project Title

Dutch Bros Coffee - N Shary Rd / Mission

Physical Address View project details and contacts
City, State (County) Mission, TX 78572   (Hidalgo County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Site Development
Contracting Method Awarded General Contractor To Subcontract, Bids by Invitation
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $350,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for a new 950 square-foot coffee shop. As of December 20, 2022, construction is currently under way. A building permit was issued in July 2022. No firm timeline as to when construction is anticipated to be finished. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

1 Story Above Grade, 950 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents