Similar Projects
Windhaven Parkway
Infrastructure
Bidding
Lewisville, TX

Sycamore Bend Road - Turbeville Road to Sycamore Bend Park Gate
Infrastructure
Bidding
$3,672,000 est. value
Hickory Creek, TX

Castle Hills Tract K Phase 2 Commercial Development Earthwork, Utilities and Paving
Post-Bid
Lewisville, TX 75028

Arrowbrooke, Phase 6 Improvements
Post-Bid
Aubrey, TX 76227

Driveway Resurface Project
Results
$100,000 to $250,000 est. value
Denton, TX 76209

Southern Region Disaster Recovery Support BPA
Results

IH 35E - Resurfacing
Infrastructure
Bidding
$7,350,223 est. value
TX

Liberty Trails Phase 2 Paving Improvements
Post-Bid
Denton, TX

Oak Grove Road Improvement and Historic Lane Resurface Project
Results
$170,072 est. value
Cross Roads, TX 76227

IH 35E - Rehabilitate Existing Roadway
Infrastructure
Bidding
$2,769,974 est. value
TX

Fishtrap Road Resurface Project
Post-Bid
Cross Roads, TX

Paving of Silverado Phase 6
Results
TX

2019 Street Reconstruction Southeast Denton Package A
Infrastructure
Bidding
Denton, TX 76209

Liberty Trails, Phase 3 - Paving Improvements
Post-Bid
TX 76100

Construction of Lakeshore Boulevard, Martingale Trail, Yacht Club Road
Results
Oak Point, TX 75068

Last Updated 12/27/2021 12:04 PM
Project Title

Utility Cut Repairs and Park Improvements

Physical Address View project details and contacts
City, State (County) Flower Mound, TX   (Denton County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Reinforced Concrete Installation (Pavement, Driveway, Drive Approach and Bench Pad) 2. Reinforced Concrete Sidewalk Installation 3. 5-1/2” Reinforced Concrete Trail Installation 4. Reinforced Concrete Curb, Curb and Gutter Installation 5. Asphalt Pavement Removal 6. Hot Mix Asphalt Concrete Pavement (HMAC) Installation 7. Barrier Free Access/Curb Ramp and Landing 8. Install Retaining Wall 9. Milsap Stone Fascia/Cladding 10. Poured-In-Place Resilient Surfacing 11. French Drain Installation 12. Irrigation Retrofit (Repairs) 13. Reinforced Concrete Headwall Installation 14. 6” & 8” PVC Pipe for Storm Drain Installation 15. Fine Grading 16. Topsoil 17. Sod Installation 18. Seed Installation 19. Earthwork (Excavation - Haul Off ONLY).

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents