Similar Projects
Fort Sanders to Tyson Park Connection - City of Knoxville
Infrastructure, Alteration
Conception
$5,915,000 est. value
Knoxville, TN 37916

Fort Sanders to Tyson Park Connection - City of Knoxville
Infrastructure, Alteration
Conception
$5,915,000 est. value
Knoxville, TN 37916

The Rowan Apartments
New Construction, Infrastructure
Design
$64,000,000 CJ est. value
Knoxville, TN 37923

Short Springs Road - Guardrail Installation
Infrastructure
Bidding
Tullahoma, TN 37388

VTS Tullahoma Transient Training Open Bay Barracks
New Construction, Infrastructure
Bidding
$1,725,000 CJ est. value
Tullahoma, TN 37388

Fence Install Oak Ridge
Infrastructure
Sub-Bidding
$150,000 CJ est. value
Oak Ridge, TN 37830

RW Estates Drive Bridge Replacement
Post-Bid
Unicoi, TN 37692

Joy Gleghorn Nature Preserve at Wells Hill Park Site Improvements
Post-Bid
Fayetteville, TN 37334

2021 Contracted Paving Area 35B
Results
Kingsport, TN

37th Avenue & Tigerbelle Drive Improvements
Results
Nashville, TN

Saxony Phase IV
New Construction, Infrastructure
Pending Verification
$52,000,000 CJ est. value
Cookeville, TN 38501

Mountain View Subdivision Phase 1
New Construction, Infrastructure
Conception
$17,400,000 CJ est. value
Spring Hill, TN 37174

Cheatham Stoplog Concrete Storage Slab
Infrastructure
Bidding
$1,000,000 CJ est. value
Ashland City, TN 37015

Bridge Replacement on Camp Austin Road
Post-Bid
Wartburg, TN

Old Highway 64 Over Branch
New Construction
Results
Bolivar, TN

Last Updated 08/04/2022 03:17 PM
Project Title

Roy Brown Lane Bridge over Flynn Creek

Physical Address View project details and contacts
City, State (County) Granville, TN 38564   (Jackson County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Roy Brown Lane Bridge over Flynn Creek

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents