Reported 11/21/2019 12:00 AM
Project Title

Utility Extension to Serve Truck Stop on GA Highway 49

Physical Address View project details and contacts
City, State (County) GA   (Peach County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

A sewer line will be extended, and an existing water main will be tapped to serve a new truck stop on Highway 49. The sewer line will be placed in an easement along the Georgia Southern Railroad. The project will include the installation of 2,586 L.F. of 10" SDR-35 PVC sewer pipe, 502 L.F. of 10" D.I. sewer pipe, 200 L.F. flanged D.I. sewer pipe constructed above ground on piers, and 120 L.F. of jack and bore under Highway 49 with a 16" casing. In addition to the pipe, 12 manholes will be installed. An 8"x2" tapping sleeve with valve and box and a water service connection with a 2" meter shall be installed to serve the new truck stop. Finally, work includes any ancillary items necessary to complete the utility extensions.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents