Similar Projects
Cousin's BBQ
Renovation - 5,500 SF
Conception
Irving, TX

Goat & Vine Winery
New Construction
Conception
Dallas, TX

Tiff's Treats
Renovation - 1,475 SF
Design
$325,000 est. value
Dallas, TX 75211

Starbucks - Shell Building
New Construction - 2,100 SF
Design
$750,000 est. value
Sunnyvale, TX

Hudson House - Lovers Lane Addition
Renovation - 4,899 SF
Post-Bid
Dallas, TX

Dutch Bros. Coffee
New Construction - 950 SF
Post-Bid
Less than $500,000 CJ est. value
Garland, TX 75043

McDonald's
New Construction - 4,400 SF
Results
$900,000 est. value
Dallas, TX 75235

23 Springs Mixed-Use / Dallas
New Construction, Infrastructure - 669,591 SF
Construction
$169,000,000 est. value
Dallas, TX 75201

Golden Chick
Renovation - 2,816 SF
Construction
$300,000 est. value
Mesquite, TX 75150

Shipley Do-Nuts
New Construction
Conception
Coppell, TX

Hawaiian Bros.
Renovation - 3,400 SF
Design
$1,989,345 est. value
Richardson, TX 75080

Mesquite Elementary School #34
New Construction - 109,472 SF
Post-Bid
$29,000,000 est. value
Mesquite, TX

Golden Chick
New Construction - 4,900 SF
Construction
$1,000,000 est. value
Rowlett, TX 75088

Shipley Do-Nuts
New Construction - 2,200 SF
Conception
$500,000 to $1,000,000 CJ est. value
Garland, TX

Hawaiian Bros.
Renovation - 3,500 SF
Design
Mesquite, TX

Reported 06/27/2022 11:56 AM
Project Title

El Dorado Dallas 55 / Preston Commons

Physical Address View project details and contacts
City, State (County) Dallas, TX 75225   (Dallas County)
Category(s) Commercial
Sub-Category(s) Food/Beverage Service
Contracting Method Bids by Invitation.
Project Status Construction Documents, Construction Start Expected July 2022, Construction Completion Expected January 2023
Bids Due View project details and contacts
Estimated Value Less than $3,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation of a restaurant in Dallas, Texas. Working plans call for the renovation of a 8,751-square-foot restaurant. As of June 24, 2022, final design is underway. Information regarding the general contractor or their method of selection has not been disclosed. Construction is scheduled to begin summer 2022 and be completed January 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Food/Beverage Service, Approximately 8,751 SF Renovation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents