Similar Projects
Kilmayne Place Senior Living
New Construction, Infrastructure - 86,000 SF
Conception
$32,000,000 CJ est. value
Cary, NC 27511

Board of Elections Paving - Wake County
Infrastructure
Conception
$370,000 est. value
Raleigh, NC 27610

Sportsmanship Crossing Development / Holly Springs
New Construction, Infrastructure - 100,000 SF
Design
$50,000,000 CJ est. value
Holly Springs, NC 27540

New Middle School (M-19) and High School (HS-11) - Wake County Public Schools
New Construction, Infrastructure - 300,009 SF
Design
$128,149,254 CJ est. value
Morrisville, NC 27560

Bowling Road Elementary School - Wake County Public Schools
New Construction, Infrastructure - 134,000 SF
Sub-Bidding
$54,544,624 CJ est. value
Fuquay Varina, NC 27526

Request to Prequalify Vendors For Residential Asbestos Abatement Services
Term Contract, Infrastructure
Post-Bid
$200,000 CJ est. value
Raleigh, NC 27603

Traditions Grande Care Facility
New Construction, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Wake Forest, NC 27587

Archives and History Building Foundation Repairs and Drainage Improvements
Renovation, Infrastructure
Results
$965,000 CJ est. value
Raleigh, NC 27601

NCSHP Grading and Parking Repairs
Infrastructure
Results
Raleigh, NC 27610

Martin Pond Road Water Main Extension
Infrastructure
Construction
$3,571,596 CJ est. value
Wendell, NC 27591

Raleigh-Durham International Airport (RDU) Runway 5L-23R Pavement Preservation
Infrastructure
Construction
$5,000,000 CJ est. value
Morrisville, NC 27560

Wilder's Grove Retail
New Construction, Infrastructure - 11,000 SF
Pending Verification
$3,500,000 CJ est. value
Raleigh, NC 27610

The Exchange Raleigh - Future Phases
New Construction, Infrastructure - 125,000 SF
Pending Verification
$850,000,000 CJ est. value
Raleigh, NC 27609

Middle Creek Greenway - Town of Cary
Infrastructure
Conception
$2,000,000 CJ est. value
Cary, NC 27513

Rex Road Elementary School (E-52) - Wake County Public School System (WCPSS)
New Construction, Infrastructure - 133,364 SF
Design
$52,262,682 CJ est. value
Holly Springs, NC 27540

Last Updated 07/18/2023 09:53 AM
Project Title

Neuse River Resource Recovery Facility (NRRRF) Bioenergy Recovery Project (BERP) - BP 12 - Sidestream Treatment

Physical Address View project details and contacts
City, State (County) Raleigh, NC 27610   (Wake County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Sub-Bidding, Request for Qualifications, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $7,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

The Project or Work consists of the construction of new and modified wastewater treatment facilities including solids screening, pre-dewatering facilities, thermal hydrolysis process and feed systems, anaerobic digesters, digester gas treatment systems, process steam systems, fats, oils, and grease receiving, and other related treatment plant facilities and upgrades. The Sidestream Treatment - Bid Package No. 12 entails the construction of the new Sidestream Treatment Process Tank, IFAS Clarifier, Service Building, and new Filtrate Pump Station to be constructed as part of the Project. The CMAR and Owner have pre-qualified Contractors as listed in the Advertisement for Bids. Only these bidders will be permitted to submit bid proposals. Bidders are notified that Chapter 87, Article(s) 1, 2, & 4 of the General Statutes of North Carolina, will be observed in receiving and awarding contracts. Bidders for this Project must be licensed with the appropriate classifications and limitations. In-person attendees are strongly encouraged to wear a face mask subject to more stringent, local requirements which may be issued by the City of Raleigh or other governmental agencies having jurisdiction Furthermore, the City's goal is to contract or sub-contract fifteen percent (15%) of the contract amount to certified MWBEs on construction projects over $300,000, or with contracts that include $100,000 or more in state funding. All questions about the meaning or intent of the Bidding Documents are to be submitted to CMAR in writing only via email to NeuseBERP@crowderusa.com. Interpretations or clarifications considered necessary by CMAR, in response to such questions, will be issued by Addenda mailed, emailed, or delivered to all parties recorded by CMAR as having received the Bidding Documents. Questions received less than five (5) working days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. The City of Raleigh prohibits discrimination in any manner on the basis of race, color, creed, national origin, sex, age, handicap or sexual orientation and will pursue an affirmative policy of fostering, promoting, and conducting business with women and minority owned business enterprises.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents