Similar Projects
The Creek at Dominguez Hills
New Construction - 199,000 SF
Conception
$10,000,000 CJ est. value
Carson, CA 90746

Mission Rock - Masterplan
New Construction - 1,315,489 SF
Conception
San Francisco, CA 94137

The Seminary at Strawberry
New Construction
Design
Mill Valley, CA 94941

Warner Center Life Plan Community - Woodland Hills
New Construction - 758,835 SF
Design
$10,000,000 CJ est. value
Los Angeles, CA 91367

GAOA Big Meadow Campground Rehabilitation / Lake Alpine Amphitheater Rehabilitation
Renovation
Bidding
$100,000 to $250,000 est. value
Arnold, CA

900 Innes Park Development
Renovation
Bidding
$27,000,000 est. value
San Francisco, CA

Value Point Parks and Recreation and Playground Equipment
New Construction
Sub-Bidding
$660,000 est. value
Sacramento, CA

Park: All Inclusive Playground - Emma Prusch
New Construction
Post-Bid
$2,250,001 to $2,750,000 est. value
San Jose, CA

Hatch Preschool Playground Project
New Construction
Post-Bid
Half Moon Bay, CA 94019

Tahoe Park Pool Restroom Renovation
Renovation, Infrastructure
Results
$220,570 est. value
Sacramento, CA 95820

Creekside and Meadowbrook Group Area Renovation at Vasona Lake County Park
Renovation
Results
$924,206 est. value
Los Gatos, CA 95032

The Landing at Arroyo and Vintage at Sycamore
New Construction
Construction
$114,000,000 est. value
Simi Valley, CA 93065

Traditions at the Meadow Subdivision
New Construction - 7,500 SF
Pending Verification
$1,000,000 est. value
Martinez, CA 94553

Mixed-Use Residential Village
New Construction
Pending Verification
San Jose, CA 95131

Magnolia Flats
New Construction, Build-Out - 85,900 SF
Conception
Less than $500,000 CJ est. value
Riverside, CA 92506

Last Updated 04/20/2022 01:50 PM
Project Title

Holly Mini Park

Physical Address View project details and contacts
City, State (County) Oakland, CA 94603   (Alameda County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $545,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed work consists, in general of renovation of Holly Mini Park. To provide labor, equipment, material, and supplies as necessary to install, place, construct and complete the project as shown in the bid documents; general site demolition; clearing and grubbing; remove and dispose existing chain link fence at the beginning of the project; demolish and dispose of existing playground structure; remove one existing light pole and return to City maintenance yard (7101 Edgewater Drive); site earthwork and rough grading; import and export fills; electrical utility and lighting equipment; water utilities and furnishings; furnish and place landscape boulders; install, place, and construct CMU mural wall, footing, and plaster; furnish and place boulder retaining wall; site drainage and French drain; fine grading; rigid and permeable paving at pathways; basketball court; and picnic areas; furnish and install new playground equipment, basketball hoop and site furniture; signage; play area safety surface; sidewalk repairs; planting and irrigation; furnish and install new fencing and gates; and all other work

Details

Park/Playground, Renovation.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents