Similar Projects
Water Control Structure (WCS) No.108 Replacement
New Construction
Bidding
$3,085,115 est. value
North Port, FL

Phase II Repairs to Lake Manatee Dam
Renovation
Bidding
Bradenton, FL

Hillsborough River Dam North Embankment Remediation
Results
$517,080 est. value
FL

Tsala Apopka Golf Course Control Structure Modification
Bidding
$500,000 est. value
Inverness, FL 34450

Structures - S-160 and S-163 Gate Refurbishment Support
Results
$500,000 to $999,000 est. value
Tampa, FL 33610

Myakka River State Park - Upper Lake Restoration
Renovation
Bidding
Sarasota, FL 34241

Knowles Crossing
New Construction, Infrastructure
Post-Bid
$75,000 est. value
Clewiston, FL 33440

Knowles Crossing
New Construction, Infrastructure
Post-Bid
$75,000 est. value
Clewiston, FL 33440

Flood Gate Submersible Panel Replacement (Rivera Drive)
Renovation
Post-Bid
Coral Gables, FL 33114

S-96 Rehabilitation
Renovation
Results
$2,784,130 est. value
FL

Lake Pretty Structure Replacement
Results
Less than $200,000 est. value
Odessa, FL 33556

Water Control Structure (WCS) 108 Replacement
New Construction
Bidding
$3,085,115 est. value
North Port, FL

Lake Apopka Duda Water Storage Improvements
Results
Less than $2,389,000 est. value

Lake Apopka Duda Water Storage Improvements
Results
Less than $2,389,000 est. value

Salinity Barrier Improvements
Results
Jupiter, FL

Last Updated 08/31/2021 02:53 PM
Project Title

Wetland Outfall Weirs and Valves

Physical Address View project details and contacts
City, State (County) Melbourne, FL 32940   (Brevard County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Pre-Construction Video 2. Remove existing aluminum weir blocks or bolted plates from control structures listed below. Anchor bolts to be cut flush and patched with non-shrink grout. 3. Install new stop logs to the indicated top of weir elevation. Stop logs to be Plastifab fiberglass stop logs or approved equal. 4. As-built records indicating finish top weir elevation required. Data to be provided in NAVD 88 and NGVD 29. 5. Restore site to pre-construction condition. 6. Cell/lake water levels will be maintained at elevations in the table below. It will be the contractor’s responsibility to manage water levels during weir repairs.

Details

Division 02 - Existing Conditions, Environmental Assessment, Natural Environment Assessment, Subsurface Investigation, Water Remediation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 32 - Exterior Improvements, Wetlands.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents