Similar Projects
I-285 Westbound Auxiliary Lane Extension
Infrastructure
Bidding
GA

Northeast Trail Phase II - Segment II Construction
Infrastructure
Bidding
Atlanta, GA

SR 400 Express Lanes
Post-Bid
Less than $13,000,000 est. value

T32 - Routine Maintenance Services - District 7
Term Contract
Post-Bid

Southern Region Disaster Recovery Support BPA
Results

Asphalt Rejuvenation Project
Results
$66,430 est. value
Milton, GA 30004

Rooms To Go Drive Addition
Alteration
Construction
$90,000 est. value
Atlanta, GA 30305

Oakmulgee Ranger District Road Maintenance
Post-Bid
$2,500 to $5,000,000 est. value

Asphalt Reconstruction and Resurfacing Project
Results
Milton, GA

T32-D7-PCC-I85 I75 Split SB-119952
Infrastructure
Post-Bid
GA

Road Resurfacing
Results
Atlanta, GA 30303

Concrete and Portland Cement Concrete (PCC) Pavement Rehabilitation Services – District 7
Infrastructure
Post-Bid

2020 LMIG Full Depth Reclamation Project on Various Streets
Results
Less than $215,892 est. value
Duluth, GA 30095

T32-D7-Pavement Preservation Maintenance-127592
Infrastructure
Post-Bid
GA

Bell Road at Rogers Circle Roundabout and Trail Project
Results
GA

Last Updated 12/29/2021 12:03 AM
Project Title

I-285/I-20 West Interchange Project

Physical Address View project details and contacts
City, State (County) Atlanta, GA 31175   (Fulton County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Design-Build. Competitive Bids.
Project Status Pre-Solicitation, Bidding Expected July 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project will include the reconfiguration of the I-285 at I-20 West Interchange and improvements along I-20 (Project). On I-20, the Project will begin at the Factory Shoals Road overpass, just East of the Thornton Road Interchange, and will end East of the I-285/I-20 Interchange at Hamilton E. Holmes Drive. The Project also includes lane modifications on I-285 from Martin Luther King, Jr. Drive South of the I-285/I-20 Interchange to Donald Lee Hollowell Parkway NW, the addition of a westbound collector-distributor lane on I-20 from the I-285/I-20 Interchange to Fulton Industrial Blvd., auxiliary lanes on I-20 and bridge replacements and widenings along I-20 and within the interchange. The Project shall not preclude the design and construction of the future I-20 West Express Lanes (PI 0013916) and the future I-285 Westside Express Lanes (0013917) projects.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents