Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

SR 715/ 611 Intersection
Infrastructure
Design
$9,330,537 CJ est. value
Henryville, PA 18332

SR 715/ 611 Intersection
Infrastructure
Design
$9,330,537 CJ est. value
Henryville, PA 18332

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

County Bridge #8 - Foundry Road (T-231)
Infrastructure
Bidding
$2,500,000 CJ est. value
East Stroudsburg, PA 18301

Snowplowing for 15 Miles of Road
Alteration
Post-Bid
Effort, PA

Snow Plowing Services
Term Contract
Post-Bid
East Stroudsburg, PA

Pocono Auxiliary Water Tank
New Construction, Infrastructure
Results
$3,398,357 CJ est. value
Swiftwater, PA 18370

In Place Paving
Results
Brodheadsville, PA

Black Buffalo 3D Corporation
Demolition, New Construction, Infrastructure - 150,000 SF
Pending Verification
$35,700,000 CJ est. value
Smithfield Township, PA 18301

Margaritaville Resort Village Pocono Mountains
Demolition, New Construction, Infrastructure
Pending Verification
$1,300,000,000 CJ est. value
Pocono Manor, PA 18349

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

SR 715 over Pocono Creek
Demolition, New Construction, Infrastructure
Design
$3,855,006 CJ est. value
Henryville, PA 18332

Well House Variable Frequency Drive (VFD) Installs
Infrastructure
Bidding
$100,000 CJ est. value
Tobyhanna, PA 18466

Last Updated 03/01/2023 07:09 AM
Project Title

209 BUS (SR 2012) Mt Tom

Physical Address View project details and contacts
City, State (County) East Stroudsburg, PA 18301   (Monroe County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $2,759,780 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

State Route 2012 (Business Route 209) from the Mount Tom Road Intersection (Valhalla Drive) to the Airport Road intersection Smithfield Township Monroe County Primary Improvement Type: Safety Improvement As of March 01, 2023, the project is in future development stage. Anticipated letting date is April 01, 2023. PennDOT - 209 BUS (SR 2012) Mt Tom *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents