RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Emergency Communications Tower Construction
New Construction, Infrastructure
Post-Bid
$400,000 CJ est. value
Downers Grove, IL 60515

Systemwide Roadway Appurtenance Repairs
Results
Downers Grove, IL

2021 Asphalt Paving and Patching Program
Alteration
Results
Lombard, IL

Dash Downers Grove Apartments
New Construction, Infrastructure
Construction
$40,000,000 CJ est. value
Downers Grove, IL 60515

Naper Commons Park Development
Infrastructure
Construction
$250,096 CJ est. value
Naperville, IL 60540

Alley Maintenance
Term Contract
Post-Bid
Bensenville, IL

Asphalt Path and Associated Park Improvements
Infrastructure
Results
Aurora, IL

2022 Abbeywood South Park Asphalt Pathway Replacement
Infrastructure
Post-Bid
Lisle, IL

2022 Pavement Rehabilitation at WWSHS
Infrastructure
Results
Wheaton, IL 60189

2022 Roads Program
Infrastructure
Post-Bid
Bloomingdale, IL

2022 Site Improvements
Infrastructure
Results
Willowbrook, IL 60527

Drainage Improvements
Infrastructure
Post-Bid
$300,000 CJ est. value
Waukegan, IL 60085

I-19-4714 - Roadway & Bridge
New Construction, Infrastructure
Results
Itasca, IL 60143

Engineering Services for 2022 City Wide Resurfacing Phase III
Infrastructure
Post-Bid
Aurora, IL

Last Updated 07/25/2023 08:17 AM
Project Title

Tri-State Tollway (I-294) Roadway and Bridge Reconstruction

Physical Address View project details and contacts
City, State (County) Hinsdale, IL 60521   (DuPage County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction Commenced, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $205,907,075 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 20, 2022, a general contractor has already been awarded, and construction has commenced. I-21-4835 Tri-State Tollway (I-294) Roadway and Bridge Reconstruction Northbound I-294/ I-290/I-88 Pursuant to CPO Notice 2020.06, State agencies shall only accept electronic submissions for competitive solicitations. Paper responses will not be accepted. For more details please see the attachment titled Notice of Electronic Submissions Only. Please see attached Volume I for required documents. NORTHBOUND I-294/I-290/I-88 INTERCHANGE ROOSEVELT ROAD TO ST. CHARLES ROAD MILE POST 30.5 TO MILE POST 32.4 The work to be done under this contract shall be started on or about September 19, 2022. All work under this contract shall be completed by December 18, 2024. The location of services to be performed is on the Tri-State Tollway (I-294) northbound between Roosevelt Road and St. Charles Road (Mile Post 30.5 to Mile Post 32.4) The scope of the work shall consist of pavement removal, pavement widening, bridge rehabilitation and construction, bridge removal, retaining wall repairs and construction, noise abatement wall construction, noise abatement wall removal, mechanically stabilized earth retaining wall removal, concrete retaining wall removal, utility protection for 72" and 90" watermain, drainage and utility improvements, Intelligent Transportation System (ITS) infrastructure, temporary and permanent lighting systems, erosion control measures and landscaping improvements, signing, maintenance of traffic operations, and other miscellaneous work. *Addendum #1, #2 and #3 have been posted.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents