Similar Projects
"The Node" Mixed-Use Development
New Construction - 305,060 SF
Conception
$10,000,000 CJ est. value
Cincinnati, OH 45220

Menards / Green Township
Demolition, New Construction, Infrastructure - 173,000 SF
Conception
$14,000,000 CJ est. value
Cincinnati, OH 45248

The RED - Commercial Building
New Construction, Infrastructure - 50,000 SF
Design
$15,000,000 CJ est. value
Cincinnati, OH 45227

Bennett Point Apartments
New Construction - 86,752 SF
Design
$15,978,833 est. value
Cincinnati, OH 45202

Beechwood RAD Conversion Renovations
Renovation
Post-Bid
OH 45229

OH 75 - Roadway Minor Rehab
Infrastructure
Post-Bid
$273,883,862 CJ est. value
Cincinnati, OH 45223

Phase 3C BP1 Garage Foundations and Site Preparation
New Construction, Infrastructure
Results
$2,079,352 est. value
Cincinnati, OH 45202

Demolition and Site Restoration of 626 Tafel Street
Demolition, Infrastructure - 2,300 SF
Results
Cincinnati, OH 45225

Sycamore Street Mixed-Use Building
New Construction - 12,500 SF
Construction
$40,000,000 est. value
Cincinnati, OH 45202

Montgomery Quarter
New Construction - 192,000 SF
Construction
$150,000,000 est. value
Montgomery, OH 45242

RFP Engineering - Water Main Replacement 2023 Project Bundle 4
Infrastructure
Pending Verification
$400,000 CJ est. value
Cincinnati, OH 45202

Pottinger Subdivision
New Construction, Infrastructure
Pending Verification
$18,000,000 CJ est. value
Cincinnati, OH 45251

Market Square - Phase 4
Renovation
Conception
Cincinnati, OH 45202

Lindsay Lofts and Blair Lofts Phase II
New Construction, Infrastructure
Design
$24,000,000 CJ est. value
Cincinnati, OH 45229

Kenwood Triangle Disposition and Development
Infrastructure
Post-Bid
Blue Ash, OH 45242

Last Updated 05/08/2023 01:17 PM
Project Title

Logan Common

Physical Address View project details and contacts
City, State (County) Cincinnati, OH 45202   (Hamilton County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Site Development
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project is under construction.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents