Similar Projects
Centenial Road Bridge PM
Infrastructure, Renovation
Conception
$540,000 CJ est. value
Gettysburg, PA 17325

Centenial Road Bridge PM
Infrastructure, Renovation
Conception
$540,000 CJ est. value
Gettysburg, PA 17325

PA 116 / Trib Willoughby Run
Infrastructure
Design
$1,463,758 CJ est. value
Straban Township, PA 17325

PA 116 / Trib Willoughby Run
Infrastructure
Design
$1,463,758 CJ est. value
Straban Township, PA 17325

Major Bridge P3
New Construction
Post-Bid

Street Milling
Infrastructure
Post-Bid
Hanover, PA

Road Department - Seal Coat
Results
Gettysburg, PA

2021 Fog Seal Project
Results
New Oxford, PA 17350

Lake Meade Drive over Mud Run Superstructure Replacement
New Construction, Demolition
Construction
East Berlin, PA 17316

Willoughby Run Self-Storage Facility
New Construction, Infrastructure - 44,500 SF
Pending Verification
$4,800,000 CJ est. value
Straban Township, PA 17325

PA 116 Main Street Resurface
Infrastructure
Conception
$823,170 est. value
McSherrystown, PA 17344

PA 116 over Trib Marsh Crk
Infrastructure
Design
$2,126,000 CJ est. value
Gettysburg, PA 17325

23 WHM SGL 211 Railroad Grade Road Phase 1
Infrastructure
Post-Bid

Seal Coat
Results
Littlestown, PA

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

Last Updated 01/06/2023 01:04 AM
Project Title

Harbaugh Valley Road Bridge

Physical Address View project details and contacts
City, State (County) Fairfield, PA 17320   (Adams County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2029
Bids Due View project details and contacts
Estimated Value $325,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

State Route 3009 (Harbaugh Valley Road) over Miney Branch of Tom's Creek in Liberty and Hamiltonban Townships Primary Improvement Type: Bridge Preservation Activities As of January 06, 2023, the project is in future development stage. Anticipated letting date is January 01, 2034. NTP Date: 2034-03-02. PennDOT - Harbaugh Valley Road Bridge *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents