Similar Projects
Master As-Needed Agreement M15 Electrical Services
Alteration
Bidding
$700,000 est. value
San Francisco, CA

General Engineering (A License) Construction, San Francisco, San Mateo, Santa Clara, and Alameda Counties
Infrastructure, Alteration
Bidding
$5,000,000 est. value

H--LBAO Generator Maintenance Services
Term Contract
Post-Bid
Carson City, Nixon, NV 89424

Emergency Backup Generator
Alteration
Post-Bid
CA

Better Way Electrical Service or HVAC Project
Alteration
Results
$100,000 to $300,000 est. value
Yuba City, CA 95991

PW Transit As-Needed Contract No. 2
Infrastructure, Alteration
Results
$3,000,000 est. value
San Francisco, CA

Generator Maintenance Services - CHP Golden Gate Division Office
Alteration
Bidding
Vallejo, CA 94591

Uninterruptable Power Supply (UPS) Systems
Alteration
Post-Bid
Fresno, CA

2210 Napa-Vallejo Highway Temporary Construction Power
Alteration
Results
$75,000 est. value
Napa, CA 94559

Replacement of Five Generators
Alteration
Bidding
Novato, CA

Generators For Water And Wastewater Facilities
Infrastructure
Post-Bid
Santa Rosa, CA

Millbrae Recreation Center - Low Voltage Systems Installation
Infrastructure
Results
Millbrae, CA 94031

Moscone West Solar
Alteration
Bidding
$4,000,000 est. value
San Francisco, CA 94103

High Voltage Testing Repair
Alteration
Post-Bid
Sunnyvale, CA

Installation of Owner Furnished Outdoor LED Signs at Six (6) Sites
Alteration
Results
Banning, CA 92220

Last Updated 11/24/2021 03:33 PM
Project Title

Jameson Pump Station VFD Replacement and Pump Station Emergency Power Transfer and Generator Connection Improvements

Physical Address View project details and contacts
City, State (County) Fairfield, CA 94534   (Solano County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be done for WT 7112 - Jameson Pump Station VFD Replacement includes: Furnishing and installing medium voltage AC variable frequency drive (VFD) and appurtenances, concrete equipment pad extension, cabinets, and all power and control wiring cable to include all other work and facilities necessary or incidental to construct the completed improvements as directed by the plans and specifications and as directed by the Water Director. The Bidder shall include in their bid and provide all labor, tools and materials for a complete and working project in conformance with the intent shown on the drawings and specified herein. The work to be done for WT 7113 Pump Station Emergency Power Transfer and Generator Connection Improvements includes: Furnishing and installing of electrical equipment related to emergency power for thirteen (13) pump stations, including but not limited to manual and automatic transfer switches, portable generator connection boxes, all such conduit, wire and appurtenances including enclosed breakers. Furnishing and installing of concrete equipment pads, equipment anchoring, quality control, cleanup, inspection, testing, commissioning, and proper disposal of packaging materials and trash.

Details

Division 26 - Electrical, Instrumentation and Control for Electrical Systems.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents