Similar Projects
Silverleaf Development Master Plan
New Construction
Conception
Winter Garden, FL 34787

Tomyn Ocoee Self-Storage
New Construction - 34,969 SF
Conception
Ocoee, FL

Airport Commerce Center
New Construction - 656,000 SF
Design
$10,000,000 CJ est. value
Orlando, FL 32824

LBA Realty Office/Warehouse 300 & 400
New Construction, Demolition - 576,000 SF
Design
Winter Park, FL 32792

Grease Traps and Lift Station Maintenance with Septic Tank Pump Outs
Renovation, Infrastructure
Bidding
Orlando, FL

Grease Traps and Lift Station Cleaning, Maintenance, and Repair
Renovation, Infrastructure
Bidding
Orlando, FL 32819

OUC St Cloud Operations and Maintenance Facility
New Construction - 300,000 SF
Post-Bid
Orlando, FL 32800

Judge Business Center
New Construction - 79,400 SF
Post-Bid
Orlando, FL

Orange County Southwest Service Area Potable Water Storage and Repump Facility and Avalon Road Master Pump Station
Results
Less than $18,954,291 est. value
Winter Garden, FL 34787

Orange County Utilities Pump Station Package 40
Results
$2,068,770 est. value
FL

Disney Distribution Warehouse DC 21
New Construction - 45,165 SF
Construction
$13,600,000 est. value
Lake Buena Vista, FL 32830

Narcoossee Logistics Center West - Warehouse Shell Building 1 & 2
New Construction - 279,845 SF
Construction
$12,553,490 est. value
Orlando, FL 32827

Industrial Warehouse Development
New Construction - 61,562 SF
Conception
Ocoee, FL 34761

Collegiate Village - Phase I - Retail Buildings 1, 1A, 2
New Construction - 19,605 SF
Design
$5,000,000 est. value
Orlando, FL 32826

Publix 1158 - Winter Garden
Renovation
Bidding
Winter Garden, FL 34787

Last Updated 06/03/2022 08:38 AM
Project Title

South Water Reclamation Facility North Plant Effluent Pump Station Pre-Engineered Building

Physical Address View project details and contacts
City, State (County) Orlando, FL 32819   (Orange County)
Category(s) Commercial, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,111,384
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes, but is not limited to, construction of a new preengineered electrical building at the South Water Reclamation Facility North Plant Effluent Pump Station.

Details

Warehouse/Storage, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware, Door Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents