Similar Projects
Murphy Express
New Construction - 2,800 SF
Conception
$500,000 to $1,000,000 CJ est. value
The Colony, TX 75056

Jack Be Drive Up Grocery
New Construction - 17,000 SF
Conception
$1,000,000 to $5,000,000 est. value

Love's Travel Stop
Renovation
Design
Denton, TX 76207

QuikTrip
New Construction - 5,300 SF
Design
$750,000 est. value
Sanger, TX 76266

Murphy Express #8925 / Crossroads
New Construction - 5,233 SF
Post-Bid
$1,500,000 est. value
Cross Roads, Little Elm, TX 76520

HEB Central Market #55 Deli Expansion
Renovation
Post-Bid
Southlake, TX 76092

7-Eleven
New Construction - 3,097 SF
Construction
$600,000 est. value
Frisco, TX 75078

QuikTrip #942
Renovation
Construction
$90,000 est. value
Lewisville, TX 75077

Little India / Remodeling
Renovation - 8,000 SF
Design
$600,000 est. value
Lewisville, TX 75056

QuikTrip #941
Renovation
Construction
$90,000 est. value
Lewisville, TX 75067

QuikTrip #937
Renovation
Construction
$90,000 est. value
Frisco, TX 75034

QuikTrip #928
Renovation
Construction
$90,000 est. value
Lewisville, TX 75057

QuikTrip #912
Renovation
Construction
$90,000 est. value
Denton, TX 76207

QuikTrip #932
Renovation
Construction
$90,000 est. value
Dallas, TX 75287

HEB
New Construction
Construction
Frisco, TX 75034

Last Updated 07/07/2022 08:38 AM
Project Title

Allsup's convenience Store / #102313 Allsup's Pilot Point

Physical Address View project details and contacts
City, State (County) Pilot Point, TX 76258   (Denton County)
Category(s) Commercial
Sub-Category(s) Supermarket/Convenience Store
Contracting Method Bids by Invitation.
Project Status Construction Documents, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 6, 2022, plans have been submitted for permitting. A general contracting method has not been disclosed. Construction is expected to begin August 2022 and be completed December 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Supermarket/Convenience Store, 5,630 SF New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Foodservice Shelving, Food Dispensing Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines.
Division 12 - Furnishings, Countertops, Rugs and Mats, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents