Similar Projects
Replace Ice Bank Controls - Stocking Hall East
Renovation
Conception
Ithaca, NY 14853

Baker Lab Roof Replacement
Renovation
Post-Bid
$200,000 to $230,000 est. value
Ithaca, NY 14882

Uris Hall Elevator Modernization
Renovation - 1,380 SF
Post-Bid
$1,700,000 to $1,750,000 est. value
Ithaca, NY 14853

Building Controls Upgrade 2020 Package A - Building 2033 & 2033A Statler Hall & Hotel
Renovation
Results
$650,000 to $750,000 est. value
Ithaca, NY 14853

Construction Manager Term Agreement - North Region
Term Contract
Results

Martha Van Rensselaer '33 Building and East Wing Phase 3
Renovation - 105,000 SF
Construction
$32,000,000 to $34,000,000 est. value
Ithaca, NY 14853

Carpenter Hall B05 Systems Engineering Lab Code Compliance
Renovation
Construction
$750,000 to $800,000 est. value
Ithaca, NY 14850

Replacement of HVAC systems in Stocking Hall East at Cornell University - Consultant Services
Renovation - 7,000 SF
Post-Bid
Ithaca, NY 14853

Construction Manager Term Agreement - South Region
Term Contract
Results

Delta Upsilon 6 South Avenue Phase 3 Improvements
Renovation
Construction
$250,000 to $275,000 est. value
Ithaca, NY 14853

Delta Upsilon Interior Improvements - Phase 4 - First Floor Restroom
Renovation - 270 SF
Post-Bid
$150,000 to $175,000 est. value
Ithaca, NY 14850

Bradfield Hall Lab G15 Renovation
Renovation - 728 SF
Construction
$366,000 est. value
Ithaca, NY 14853

Clark Hall 1st Floor Renovations Applied & Engineering Physics
Renovation
Construction
$190,000 to $230,000 est. value
Ithaca, NY 14853

Willard Straight Hall Freight Elevator Replacement & Interior Renovations
Renovation - 2,000 SF
Construction
$2,400,000 est. value
Ithaca, NY 14853

Bradfield Hall Rehabilitation / System Upgrades
Renovation
Construction
$12,815,000 est. value
Ithaca, NY 14853

Last Updated 08/23/2021 03:00 PM
Project Title

Planned Maintenance Project 2019 - Comstock Hall

Physical Address View project details and contacts
City, State (County) Ithaca, NY 14850   (Tompkins County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method
Project Status Construction Commenced July 2021, Construction Completion Expected November 2021
Bids Due View project details and contacts
Estimated Value $2,016,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

College/University, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents