Similar Projects
South Main Street Mixed Use and Self-Storage
New Construction - 93,240 SF
Conception
Freetown, MA 02702

U-Haul Moving And Storage Store
Renovation - 84,785 SF
Conception
New Bedford, MA 02745

U-Haul
Renovation
Design
Less than $28,000 est. value
Taunton, MA 02780

Farland Corp Offices
Renovation - 13,873 SF
Design
Dartmouth, MA

Stop & Shop Distribution Center
Addition - 976,270 SF
Post-Bid
Freetown, MA 02702

Commerce Drive Fit-out
Build-Out - 17,000 SF
Post-Bid
Fall River, MA 02720

Scheduled and Emergency Salt Shed Repairs and Improvements at Various Locations
Results
Less than $450,000 est. value

New Maintenance Garage Building - General Bid
Results
Less than $574,631 est. value
Fairhaven, MA 02719

National Van Builders
New Construction
Pending Verification
Taunton, MA 02780

North Common Estates - Corner Space
Build-Out - 4,852 SF
Pending Verification
Mansfield, MA

Greater Attleboro Area Council For Children
New Construction - 27,560 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
North Attleborough, MA 02760

Park Street Self Storage
New Construction - 23,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Taunton, MA

Jones Park/Allen Street Garage Building
Results
Dartmouth, MA 02747

Former Aerovox Facility
New Construction
Conception
New Bedford, MA

Amazon Distribution Center
New Construction - 350,000 SF
Design
Taunton, MA 02780

Reported 03/30/2021 09:15 AM
Project Title

True Storage

Physical Address View project details and contacts
City, State (County) New Bedford, MA 02746   (Bristol County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method
Project Status Construction Commenced February 2021, Construction Completion Expected second quarter 2021, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value $1,750,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

75,076 SF - 1 Warehouse/Storage, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents