Repair/Maintain Airfield Stormwater System Phs II, FGWB 04-0014P2A and FGWB 04-0014P2B
Design
$5,000,000 to $10,000,000 est. value
Marietta, GA

Hopkins Creek/Stanley Road Sewer Interceptor
Bidding
GA

Dowling Drive Sewer Relocation
Bidding
Augusta, GA 30907

New Dunbar Road Regional Stormwater Facility
Post-Bid
Byron, GA 31008

FGWB 14-0014P2A, Maintain Airfield Stormwater System Phase II & FGWB 14-0014P2B Repair Stormwater System Phase II
Post-Bid
$5,000,000 to $10,000,000 est. value
Marietta, GA

Water, Waste Water, and Storm Water Run-Off Usage at The Gillem Enclave
Results
Forest Park, GA 30297

FY 2018 Water Main Improvements Project
Results
Less than $2,000,000 est. value
Gainesville, GA

Oakwood Drive Stormwater Improvements
Alteration
Bidding
Cumming, GA 30040

Railroad Avenue - CDBG 2016 - Storm Sewer and Roadway Improvments
Post-Bid
Cochran, GA 31014

Green Infrastructure Design Challenge - Continental Colony Elementary
Results
Atlanta, GA 30331

Clyattville Elementary School Sewer
Alteration
Bidding
Clyattville, Valdosta, GA 31601

1291 Creek Wood Cove Storm Drain Replacement Project
Post-Bid
Lawrenceville, GA 30046

FY 2018 CDBG
Results
Less than $1,397,324 est. value
Cornelia, GA

Prequalified Contractors List
Post-Bid
East Point, GA

Edgehill Place Storm Drainage Repair
Results
Johns Creek, GA

Reported 05/18/2021 12:00 AM
Project Title

Fy 19 Stormwater Rehabilitation Program Boone Street Outfall To Mill St.

Physical Address View project details and contacts
City, State (County) Gainesville, GA   (Forsyth County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency - 05/17/21
Owner View project details and contacts
Architect View project details and contacts
Description

The Project will consist of furnishing all products and performing all labor necessary for stormwater systems upgrades to the Boone Street Outfall along Mill Street, including all necessary traffic control, milling, paving, and other miscellaneous items necessary to complete the work. All together the project consists of cured-in-place pipe rehabilitation of 944 LF of storm pipe, 3 catch basins, and approximately 110 LF of curb and gutter. Pre-qualification of Bidders is required for the FY19 - Stormwater Rehabilitation Program – Boone Street Outfall to Mill St.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents