Similar Projects
New Boiler Room Construction
New Construction
Design
Jackson, MS

Phase East West Corridor
New Construction
Bidding
Mississippi State, Starkville, MS 39759

USM Invertebrate Growout Lab
New Construction
Bidding
Ocean Springs, MS 39564

Student Services Building
New Construction
Post-Bid
Clarksdale, Jackson, MS 38614

Student Services Building
New Construction
Post-Bid
Clarksdale, Jackson, MS 38614

Fountain Hall Improvements
Renovation
Results
$159,500 est. value
Raymond, MS

Jim and Thomas Duff Center for Science and Technology Innovation
New Construction
Results
University, MS 38677

Rowan Hall Second Floor Renovation
Renovation
Construction
$463,700 est. value
Lorman, MS 39096

Culinary Arts Building MUW
New Construction
Construction
$15,000,000 est. value
Columbus, MS 39701

Nursing Elevator Improvements - Nursing and Allied Health Campus
Renovation
Bidding
Jackson, MS 39204

2021 Summer Classroom Modifications
Renovation
Post-Bid
Oxford, MS

Ellzey Hall Renovations
Renovation
Results
Wesson, MS 39191

USM Gulf Coast Library Interior Repair - Hurricane Zeta
Renovation
Bidding
Long Beach, MS 39560

University of Mississippi Thad Cochran Wall Repair
Renovation
Post-Bid
Oxford, MS

Career-Technical Improvements Hinds Community College
Renovation
Results
$2,200,000 to $3,000,000 est. value
Raymond, MS 39154

Reported 10/08/2021 12:00 AM
Project Title

SOC Film Area Office Suite

Physical Address View project details and contacts
City, State (County) Oxford, MS 38655   (Lafayette County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work is required to facilitate the use of the building for academic space for the University. More specifically, this area will e used to house a Mathematics Lab, General Classroom and associated utility and service space. The project consists of the work necessary to infill approximately 38,200 square feet of the existing Wal-Mart on the campus of The University of Mississippi. The work includes minor interior demolition, new construction of metal stud and gypsum board walls, new interior finishes, raised floor system and minor structural additions. the existing HVAC systems will be provided in order to support the new restroom facilities required in the scope of work. Existing fire sprinkler system will be modified and added to as required to accommodate the new work. The scope of work will include all new electrical services, communications and lighting.

Details

College/University, 38,200 SF Addition.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents