Similar Projects
Obrecht Riehl Properties
New Construction
Conception
$3,000,000 est. value
Brunswick, GA 31523

Candlewood Suites / Brunswick
New Construction, Infrastructure - 54,171 SF
Conception
$10,000,000 CJ est. value
Brunswick, GA 31525

Panda Express / Canton
New Construction, Infrastructure
Design
$700,000 CJ est. value
Canton, MI 48188

Panda Express / Canton
New Construction, Infrastructure
Design
$700,000 CJ est. value
Canton, MI 48188

Construction Services for Pump Stations 3101, 4001 and 4002 Rehabilitation Project
Renovation, Infrastructure
Bidding
$1,650,000 CJ est. value
Brunswick, GA 31520

Construction Services for North Mainland Water Loops
Infrastructure
Bidding
$2,589,000 CJ est. value
Brunswick, GA 31520

Dollar General
New Construction - 10,640 SF
Post-Bid
$750,000 est. value
Brunswick, GA

RFP D/B - Jekyll Island Airport Terminal Replacement Design/Build
Demolition, New Construction, Infrastructure - 2,400 SF
Post-Bid
$900,000 CJ est. value
Jekyll Island, GA 31527

Oglethorpe Block Redevelopment
Renovation
Results
Brunswick, GA

2022 LMIG Resurfacing and Restriping Project FY22
Infrastructure
Results
GA

Walmart Supercenter #639-248 - SPRB-R
Renovation
Construction
$2,100,699 est. value
Brunswick, GA 31525

Construction of Jekyll Island Public Safety Complex
New Construction, Infrastructure - 19,759 SF
Construction
$26,000,000 CJ est. value
Jekyll Island, GA 31527

Norwich Street Extension Office Building
New Construction, Infrastructure
Pending Verification
$600,000 CJ est. value
Brunswick, GA 31520

Altamaha Trading Company
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Brunswick, GA 31525

New Jesup Highway Storage Facility
New Construction, Infrastructure
Conception
$600,000 CJ est. value
Brunswick, GA 31520

Last Updated 07/26/2023 11:07 AM
Project Title

Buc-ee's #63 Travel Center / Brunswick

Physical Address View project details and contacts
City, State (County) Brunswick, GA 31525   (Glynn County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Retail, Site Development
Contracting Method Negotiated General Contractor To Subcontract, Bids by Invitation
Project Status Contract Award, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $19,200,000 [brand] Estimate
Plans Available from Negotiating General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

*As of July 26, 2023, all trades are let at the negotiated general contractor. Construction is expected to begin in October 2023. This project is for the new construction of a 74,707-square-foot Buc-ee's Travel Center, and all associated site work and site utilities. Scope of work includes but is not limited to the following: Site Work and Site Utilities, Landscape and Irrigation, Fencing and Gates, Termite Treatment, Structural Concrete/Concrete Paving/Tilt-Up Panels, Masonry, Stacked Stone Veneer and Cast Stone Trim, Structural and Misc. Steel, Rough and Finish Carpentry - Millwork, FRP, Stucco and EIFS, TPO and Standing Seam Metal Roofing, Roof Logo, Caulking and Waterproofing, Doors Frames and HW, Overhead Doors, Storefront and Glazing, Automatic Entry Doors, Metal Stud Framing and Drywall, Acoustical Ceiling, Flooring and Tile, Painting, Division 10, Building and Fuel Canopy Signage, Fixturing and Installations, Metal Fuel Canopy System, Loading Dock Equipment, Fuel Station Equipment, Food Service Equipment, Fire Sprinkler, Plumbing, Refrigeration, HVAC, Electrical, Low Voltage, EMS, and EAS.

Details

1 Story Above Grade, 74,707 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents