Similar Projects
Orange County Southwest Service Area Potable Water Storage and Repump Facility and Avalon Road Master Pump Station
Bidding
Less than $18,954,291 est. value
Winter Garden, FL 34787

Generator Preventative Maintenance Services (Region 2)
Term Contract
Bidding
Daytona Beach, Jacksonville, Orlando, FL 32837

Limitorque Electric Actuators, Parts and Labor
Post-Bid
Orlando, FL 32801

UPS Equipment
Post-Bid
Orlando, FL 32827

Park Masterlift Station Replacement
Results
Eatonville, FL 32751

Emergency Generator Maintenance and Repairs for Utilities
Term Contract
Results
Orlando, FL 32819

Packing District Park - Master Lift Station Upgrades
Renovation
Construction
Orlando, FL 32869

Generator Preventative Maintenance Services (Region 3)
Term Contract
Bidding
Lakeland, Largo, Orlando, Saint Petersburg, Tampa, FL 32801

HVAC System Replacement, Roof Replacement, Supply and Install Solar Energy System at the OHA Executive Office
Post-Bid
Orlando, FL 32803

Lift Station No. 45 Replacement
Results
Less than $6,500,000 est. value
Orlando, FL 32802

Pre-Event Generator Installation
Bidding

Pole Inspection and Maintenance
Term Contract
Post-Bid
Orlando, FL 32801

Lift Station #17 Rehabilitation
Results
Less than $350,000 est. value
Maitland, FL 32751

Construction of Lift Station 1 Relocation
New Construction
Bidding
Maitland, FL

Commercial Solar Aggregation Program and Supplies
Post-Bid
Orlando, FL 32801

Last Updated 04/01/2021 10:00 AM
Project Title

Moss Park Lift Station and Electrical Upgrades

Physical Address View project details and contacts
City, State (County) Orlando, FL 32832   (Orange County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Electric, Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes replacement/addition of new lift stations, sanitary lines, and electrical panelboards, feeder and pedestals. Project Description 1. Remove old panel boards and replace them with new panel boards. 2. Remove old pedestals and replace them with new pedestals. Each pedestal will contain only power, a new spigot will be provided next to pedestal for water. 3. Abandon old lift station 1 in place. 4. Add new lift stations and muffin monsters.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents