Similar Projects
Notice #19-27-Cp272988-Seel Rm 185C Cosinc Chr Lab Renovatio
Renovation
Post-Bid
Less than $600,000 est. value
Boulder, CO 80303

Notice #19-32-Pr01026/Hsg11122-C4c-Ofc Suite Renovations
Renovation
Post-Bid
Less than $650,000 est. value
Boulder, CO

Cu Boulder Mse/Rasei Suite Renovation
Renovation - 8,425 SF
Results
Less than $1,000,000 est. value
Boulder, CO 80303

SEEL-RM 356A-COSINC-FAB Construction Management / General Contracting Services
Results
$3,500,000 est. value
CO

Case- Accomodated Testing Center
Build-Out
Post-Bid
Boulder, CO

Notice 20-05-Cp282088-Muen-E412-18 Reno & Cp292026-Muen-D044
Renovation
Results
Less than $750,000 est. value
Boulder, CO 80309

Sullivan Student Center Dining Hall Renovation
Renovation
Post-Bid
Less than $500,000 est. value
Jansen, CO 81082

Red Cross Memorial Plaza
Results
Less than $156,000 est. value
Aurora, CO 80045

1135BRD - 1135 Broadway Renovations
Renovation - 14,740 SF
Post-Bid
Less than $3,600,000 est. value
Boulder, CO 80309

Cira Commons - Building Core and Shell
Results
Less than $925,000 est. value
Fort Collins, CO 80521

Ucb000270-Stne-Kitchen Maintenance-2021-Rfp-Dbb
Post-Bid
Less than $544,000 est. value

Pharmacy 2nd Remodel Wall between Rooms 2210 and 2211
Renovation
Results
Less than $167,000 est. value
Aurora, CO

Willard Hall Maintenance-2021-Rfp-Dbb
Term Contract
Post-Bid
Less than $1,182,500 est. value
Boulder, CO

Ucb000246-Stne-Building Skin Maintenance-2021
Term Contract
Post-Bid
Less than $375,000 est. value

Camp-Icr-Prelim Plan & Design
Renovation
Post-Bid

Last Updated 12/10/2020 05:39 PM
Project Title

Simulation Lab Upgrade

Physical Address View project details and contacts
City, State (County) Alamosa, CO 81101   (Alamosa County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To provide an upgrade to the simulation lab equipment and software as the current software and cameras are no longer supported. Qualified vendor must provide software, equipment, install, start-up, training, and freight.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents