Similar Projects
Kendall Town Center
New Construction - 1,174,730 SF
Conception
Miami, FL

Smart Brickell - Tower III
New Construction, Build-Out - 30,000 SF
Conception
Miami, FL

The Hotels at Island Gardens
New Construction
Design
Miami, FL

Eastside Ridge
New Construction - 5,420,829 SF
Design
$10,000,000 CJ est. value
Miami, FL

Lids
Renovation
Bidding by Invitation
Miami, FL 33172

Del Monte Restaurant
Renovation - 1,087 SF
Post-Bid
$10,000 est. value
Coral Gables, FL

Walmart Supercenter #2091-258 - OGP
Renovation - 850 SF
Post-Bid
Doral, FL 33126

Hotel 18
Renovation, Addition - 15,557 SF
Construction
$8,000,000 est. value
Miami Beach, FL

TownePlace Suites
New Construction - 58,389 SF
Construction
$14,000,000 est. value
Miami, FL

Le Jeune Road Development
New Construction
Conception
Coral Gables, FL

Afishonado
Build-Out - 7,000 SF
Design
Less than $500,000 CJ est. value
Coconut Grove, FL

Sam`S Club #6217-218 - RM
Renovation - 162,359 SF
Post-Bid
Miami, FL 33126

Hampton Inn & Suites
New Construction
Construction
$10,000,000 CJ est. value
Kendall, FL

The Miami Wave
New Construction
Conception
Miami, FL

New North Town Center
New Construction, Renovation - 325,000 SF
Design
$10,000,000 CJ est. value
North Miami Beach, FL

Reported 02/09/2021 10:17 AM
Project Title

Arlo Wynwood

Physical Address View project details and contacts
City, State (County) Miami, FL 33127   (Miami-Dade County)
Category(s) Commercial, Entertainment/Recreation
Sub-Category(s) Fitness Center, Food/Beverage Service, Hotel/Motel, Retail
Contracting Method
Project Status Construction Commenced January 2021
Bids Due View project details and contacts
Estimated Value Greater than $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Retail, Build-Out, 1 Fitness Center, 1 Story Above Grade, Build-Out, 1 Hotel/Motel, 9 Stories Above Grade, Approximately 141,758 SF New Construction 217 Unit(s), Food/Beverage Service, Build-Out.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Specialty Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Interior Specialties, Compartments and Cubicles, Toilet Compartments, Partitions, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Refrigerated Display Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Walk-In Freezers, Foodservice Shelving, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Bar Equipment, Service Line Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment, Commercial Dishwashers, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Rugs and Mats, Hospitality Furniture.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 14 - Conveying Equipment, Elevators.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents