Similar Projects
U-Haul Warehouse
Renovation - 49,837 SF
Conception
Boca Raton, FL 33431

Star Key Industrial Park
New Construction - 1,000,000 SF
Conception
$10,000,000 CJ est. value
Delray Beach, FL 33446

Congress Business Park Warehouse
New Construction, Build-Out - 44,500 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Lake Park, FL 33403

Congress Business Park Warehouse
New Construction, Build-Out - 44,500 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Lake Park, FL 33403

Lotis - Retail/Office
New Construction - 41,600 SF
Bidding
$5,000,000 to $10,000,000 CJ est. value
Wellington, FL 33414

Lee Square
New Construction - 1,217,016 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Lake Worth, FL 33463

Sundy Village - Buildings 1, 2, 3, 8, 9, Garage
New Construction
Post-Bid
Delray Beach, FL 33444

Y1AZ--Renovate Building Number 10 Veterans Benefits Administration Office Space, West Palm Beach, FL.
Renovation - 1,900 SF
Results
$500,000 to $1,000,000 est. value
Riviera Beach, FL 33410

115 N. Federal Highway Infill Mixed-Use Redevelopment Project
New Construction
Results
Boynton Beach, FL 33435

Florida Power and Light Corporate Office
New Construction, Build-Out - 225,000 SF
Construction
$97,324,539 est. value
Palm Beach Gardens, FL 33410

Love Street Development
New Construction, Build-Out - 27,950 SF
Construction
$30,000,000 est. value
Jupiter, FL 33477

One Flagler
New Construction, Build-Out - 524,831 SF
Pending Verification
$88,000,000 est. value
West Palm Beach, FL 33401

Florida Power & Light - Port West Physical Distribution Center
New Construction, Addition, Demolition - 3,060 SF
Pending Verification
Riviera Beach, FL 33407

Boynton Parc
New Construction - 300,000 SF
Conception
$10,000,000 CJ est. value
Boynton Beach, FL 33472

The Commons at Abacoa III - Post Acute Medical
New Construction - 48,941 SF
Design
$25,000,000 est. value
Jupiter, FL 33458

Last Updated 04/15/2022 12:00 AM
Project Title

Orion Integrated Systems

Physical Address View project details and contacts
City, State (County) Jupiter, FL 33458   (Palm Beach County)
Category(s) Commercial, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Office
Contracting Method
Project Status Permitting, Construction Start Expected second quarter 2022, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value $909,066
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project to include approximately 5,100 square feet for office and 2,000 square feet for industrial warehouse.

Details

Office, Industrial Warehouse, 2 Stories Above Grade, 7,068 SF New Construction, 0.47 Acre.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents