Similar Projects
22nd Street North East and B Avenue Intersection
Conception
$150,000 est. value
Cedar Rapids, IA 52402

9Th Avenue South East Improvements from 3rd Road Street to Railroad
Conception
$200,000 est. value
Cedar Rapids, IA 52407

Ingleside Drive South West Pavement Improvements
Design
$250,000 est. value
Cedar Rapids, IA 52404

10th Street & Sunrise Dr Phs II A Improvements
Infrastructure
Design
$13,300,000 est. value
Waukee, IA

NW Douglas Parkway - Grade, Partial Pave and JUT
Infrastructure
Bidding
$1,000,000 est. value
Waukee, IA 50263

County Road Improvements
Infrastructure
Post-Bid
IA

Valley Junction Alleys Phase 6
Infrastructure
Post-Bid
West Des Moines, IA

Douglas Parkway Extension
Infrastructure
Results
Waukee, IA 50263

South Second Street Reconstruction
Infrastructure
Results
$105,210 est. value
Kimballton, IA 51543

Blairs Ferry Road Improvements and 18Th Avenue Extension
Conception
$333,000 est. value
Cedar Rapids, IA 52407

2021/2022 Sealcoat Work
Infrastructure
Post-Bid
$60,000 est. value
Maquoketa, IA

HMA Joint and Crack Sealing - IOWA 92, IOWA 149
Infrastructure
Results
IA

Northwest Weigel Drive Asphalt Overlay - Northwest 18 Street to Northwest 36 Street - STR-22-002 - City of Ankeny
Infrastructure
Conception
$1,100,000 est. value
Ankeny, IA 50023

Microsurfacing
Infrastructure
Results
IA

Legacy Pointe Boulevard Improvements
Infrastructure
Conception
$500,000 est. value
Waukee, IA

Reported 06/28/2022 01:02 PM
Project Title

South 7th Street (9th Avenue East to 15th Avenue East) - 2010-121 - City of Oskaloosa

Physical Address View project details and contacts
City, State (County) Oskaloosa, IA 52577   (Mahaska County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Design Development, Construction Start Expected March 2025
Bids Due View project details and contacts
Estimated Value $1,221,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a road / highway in Oskaloosa, Iowa. Design plans call for paving for a road / highway; and road / highway. This project includes complete street reconstruction, ADA sidewalk and ramps of approximately 1790 feet of South 7th Street from 9th Avenue East to 15th Avenue East. This project was applied and approved for through Area 15 Regional Planning Commission (RPA 15) for the Surface Transportation Block Grant (STBG) funds, commonly known as the Surface Transportation Program (STP). The preliminary cost estimate for this project is $1,400,000 and will be 100% STBG funding. The existing pavement on South 7th has begun to fail and needs complete concrete pavement reconstruction. 7th Street is a major connector which carries approximately 1,580 vehicles per day. As of June 27, 2022, this project is currently in the FY 2022-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents