Similar Projects
Rithm at Uptown
New Construction, Demolition
Conception
Tampa, FL 33612

Sprouts Farmers Market - Tampa Heights
Build-Out - 24,015 SF
Conception
$1,000,000 est. value
Tampa, FL 33602

Walmart Supercenter #1203-240 - SPRB-R
Renovation - 207,950 SF
Design
Wimauma, FL

AutoZone #5379
New Construction - 6,000 SF
Design
$500,000 to $1,000,000 est. value
Brandon, FL 33511

Walmart Supercenter #2740-276 - CSP
Renovation
Bidding
Tampa, FL

Walmart Supercenter #5220-276 - SPRB-R
Renovation - 12,800 SF
Bidding
Tampa, FL 33614

Circle K
New Construction - 12,841 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Gibsonton, FL 33534

Circle K
New Construction - 12,841 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Gibsonton, FL 33534

Develop CRA Owned Property
Results
Plant City, FL 33564

Midtown District Development
Results
Plant City, FL

Modera Tampa
New Construction - 615,000 SF
Construction
$74,000,000 est. value
Tampa, FL 33602

Falkenburg Commons
New Construction - 10,293 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Brandon, FL 33509

Publix
New Construction
Pending Verification
Tampa, FL 33600

City Furniture Warehouse and Showroom
New Construction - 1,058,950 SF
Pending Verification
$100,000,000 est. value
Plant City, FL 33566

Reign Living Student Apartments
New Construction - 304,464 SF
Conception
Tampa, FL

Last Updated 12/16/2021 08:57 AM
Project Title

Sprouts and Retail

Physical Address View project details and contacts
City, State (County) Tampa, FL 33612   (Hillsborough County)
Category(s) Commercial
Sub-Category(s) Retail, Supermarket/Convenience Store
Contracting Method Bids by Invitation.
Project Status All Bids Received, Selection Underway, Construction Start Expected February 2022, Construction Completion Expected October 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

SPROUTS & RETAIL projects to be priced separately.

Details

53,239 SF - Retail, 30,021 SF New Construction, Supermarket/Convenience Store, 23,218 SF New Construction.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Specialty Doors and Frames, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Foodservice Shelving, Food Dispensing Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines.
Division 12 - Furnishings, Casework, Countertops, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents