Similar Projects
Highspire Terminals Parking Expansion
Conception
Middletown, PA 17057

Pittsburgh Theological Seminary Phase 2 - 3 Interior Loop Road
New Construction
Conception
Pittsburgh, PA 15206

River Pointe Logistics Park
New Construction - 65,000,000 SF
Design
$10,000,000 CJ est. value
Mount Bethel, PA 18343

Circle M RV Campground and Resort
Renovation
Design
Lancaster, PA 17603

Residential Lots
Infrastructure
Bidding
$33,000 est. value
Taylor, PA

AMR Eastmont Swim Club, Wilkins Township, Allegheny County
Infrastructure
Bidding
$500,000 to $1,000,000 est. value
PA

Maia's Meadows - Infrastructure
New Construction
Post-Bid
Etters, PA 17319

Humboldt Industrial Park North
New Construction
Post-Bid
Hazleton, PA 18201

Breezewood Proving Grounds Improvements - Phase II
Renovation - 35,679 SF
Results
$98,477 est. value
Clearville, PA 15535

Steel Works Demolition Bid Project
Results
Steelton, PA 17113

New Jersey Central Railroad Train Station Improvement
New Construction - 32,000 SF
Construction
$1,200,000 est. value
Wilkes-Barre, PA 18704

MacArthur Commons Redevelopment
New Construction, Renovation - 16,000 SF
Construction
$2,200,000 est. value
Whitehall, PA 18052

Holtwood Solar Project
New Construction
Conception
Holtwood, PA 17565

AMR Arthurs Southeast, Paint Township, Clarion County
Infrastructure
Bidding
$100,000 to $200,000 est. value
PA

Penn Estates Roadway Paving/Roadway Repairs
Renovation
Post-Bid
East Stroudsburg, PA 18301

Last Updated 08/09/2021 02:59 PM
Project Title

Clean Fill Site Maintenance

Physical Address View project details and contacts
City, State (County) Johnstown, PA   (Cambria County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work will consist of the Contractor annually opening, closing, operating and maintaining the Clean Fill Dump Site for eight (8) months (March through October), providing and installing restoration and erosion control devices as needed, with a second base bid for a 3 year period.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents