Similar Projects
Compass
Build-Out
Conception
Houston, TX 77008

Rice University Student Center
New Construction - 80,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Houston, TX 77005

JLL Headquarters
Build-Out
Design
Houston, TX 77027

1550 On The Green
New Construction
Design
Houston, TX 77010

Right Move Self Storage
New Construction - 76,674 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Houston, TX 77025

University of Houston College of Medicine
New Construction - 133,800 SF
Post-Bid
Less than $72,500,000 est. value
Houston, TX

UH Hilton College Renovation and Expansion
Renovation
Results
$30,400,000 est. value
Houston, TX

Pathology Frozen Section Lab Renovations Phase 2
Renovation
Results
Houston, TX 77030

Park 249 Building Complex
New Construction
Construction
Houston, TX 77064

Graduate College of Social Work Renovation
Renovation, Addition - 5,000 SF
Construction
$2,300,000 est. value
Houston, TX

BCM Education Space
Renovation
Pending Verification
Houston, TX 77030

Honeywell Rebellion Office
Renovation
Pending Verification
$862,486 est. value
Houston, TX 77042

Bethune Empowerment Center
Renovation - 21,748 SF
Conception
$3,100,000 est. value
Houston, TX 77088

iHeart Media
Renovation - 10,000 SF
Design
$1,000,000 est. value
Houston, TX 77027

CMAR UH New Law Center
New Construction - 180,000 SF
Post-Bid
$60,000,000 to $72,000,000 est. value
Houston, TX 77204

Last Updated 12/29/2021 11:27 AM
Project Title

South Campus (SC) M1 Building Renovation

Physical Address View project details and contacts
City, State (County) Houston, TX 77089   (Harris County)
Category(s) Commercial, Education
Sub-Category(s) College/University, Office
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,834,092
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The SJCCD South Campus M1 Building is a one story 8,639 square foot building with administrative areas and storage space including the proposed addition to the north wall. The building has a precast concrete structure, which was originally constructed between 1981 and 1983. The building is situated on approximately 1.52 acres of land on the SJCCD South Campus. The project consists of the implementation of College approved improvements indicated in the Facility Condition Assessment Report.

Details

Office, Renovation, College/University, 8,639 SF Renovation, 1.52 Acres.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents