Similar Projects
New Bus Garage
New Construction
Conception
$177,000,000 to $234,000,000 est. value
Pittsburgh, PA

New Downtown Transit Center
New Construction
Conception
$60,000,000 to $118,000,000 est. value
Pittsburgh, PA

Junkin House Relocation
New Construction, Renovation - 800 SF
Design
Less than $500,000 CJ est. value
Mechanicsburg, PA 17050

Cargo 4 Building Intermodal Freight Transfer Facilities Development
New Construction
Design
Pittsburgh, PA

Transportation Improvements Project
Renovation
Bidding
$340,000 est. value
Wilkinsburg, PA 15221

SCI Benner - Bus/Maintenance Facility Upgrades
Renovation
Post-Bid
$2,800,000 est. value
Bellefonte, Harrisburg, PA 16823

SCI Benner - Bus/Maintenance Facility Upgrades
Renovation
Post-Bid
$2,800,000 est. value
Bellefonte, Harrisburg, PA 16823

Shawmont Station Restoration - General
Results
Philadelphia, PA

Bus Shelter Installation
Renovation
Results
Lancaster, Reading, PA

Transportation Maintenance Building
Renovation
Construction
Lititz, PA 17543

ATA Dubois Operations Facility - New Build
New Construction - 25,000 SF
Construction
$16,508,000 est. value
DuBois, PA 15801

The Atlas 1923
Renovation - 40,000 SF
Pending Verification
Harrisburg, PA 17110

Hazelwood Green Bus Shelters - Shelters for Migrating Species
New Construction
Conception
$300,000 est. value
Pittsburgh, PA 15207

Installation/Construction Of Fish Habitat Enhancement Structures
New Construction
Post-Bid
Shippensburg, PA 17257

Bus Stop Installation Project
New Construction
Results
PA

Reported 07/13/2022 12:00 AM
Project Title

Jefferson Station 10th and Filbert St. Entrance Renovation Project - General Contract

Physical Address View project details and contacts
City, State (County) Philadelphia, PA   (Philadelphia County)
Category(s) Transportation
Sub-Category(s) Misc. Structures
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected September 2022
Bids Due View project details and contacts
Estimated Value $1,400,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The "Work includes but is not limited to: Vendorto renovate the entrance way at Jefferson Station, 10 th & Filbert Street in accordance with the specifications, including but not limited to replacement of entrance storefront and doors, with updated lighting system, new flooring, repair of stonework, concourse, update of electrical system.

Details

Misc. Structures, Renovation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Protective Covers, Transportation Stop Shelters.
Division 12 - Furnishings, Multiple Seating, Pews and Benches, Benches.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents