Similar Projects
Last Updated | 11/03/2021 01:27 PM |
Project Title | Power Generation Facility |
Physical Address | View project details and contacts |
City, State (County) | Newark, NJ (Essex County) |
Category(s) | Industrial/Manufacturing |
Sub-Category(s) | Power Plant |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The primary focus of this project is the installation of power generating equipment capable of producing 34 MW of net power, that will be operated as a standby generation facility to support the Newark Bay WWTP electric load upon loss of utility power, configured for independent standby operation. Power will be generated from three (3) combustion gas turbine generators configured in an N+1 arrangement to facilitate maintenance while providing the highest degree of reliability. Other major equipment is required to support the combustion gas turbine generators operation as the intent of the facility is to provide backup power under standby mode. These components, also configured in an N+1 arrangement, include two (2) gas-fired black start engine generators, three (3) electric motor driven fuel gas reciprocating compressors, State of the Art (SOTA) emission control equipment, medium-voltage synchronizing switchgear as well as other required auxiliary components for a fully functional and permitted facility. The General Construction Contract to be procured will require the installation of highly specialized equipment being provided under an existing equipment contract and coordinating with the equipment contractor for the successful startup and testing of the equipment. In addition, the General Construction Contract will include civil site work, concrete foundations and equipment pads, a new building to house the new equipment, HVAC, process piping and electrical work necessary for the new equipment. Due to the criticality for the installation to be correct in order for the equipment to operate properly meeting the Newark Bay WWTP electrical power demands, and the fact that the equipment to be installed is of high quality (electrical utility grade) and part of a complex system |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |