Similar Projects
Basin 10 and 14 Capacity Improvements, Schedule I
Infrastructure
Bidding
$12,000,000 est. value
Fort Smith, AR

Sewer System Rehabilitation - Basins 3, 5, 6 and 7
Infrastructure
Bidding
$684,000 est. value
Bryant, AR

Upper Riverside Interceptor Assessment, Phase II
Post-Bid
$40,017 est. value
North Little Rock, AR 72117

Sewer Collection Rehabilitation
Post-Bid
Fairfield Bay, AR

Rose City and Military Drive Basins CIPP 2021 Rehabilitation Project
Results
$1,637,100 est. value
North Little Rock, AR 72117

HSWS Outfall Improvements
Results
$4,000,000 est. value
Heber Springs, AR

Heights Sewer Interceptor and Purkey Connection
Infrastructure
Bidding
$200,000 est. value
Springdale, AR

Little Osage Creek Gravity Sewer Improvements Project
Infrastructure
Post-Bid
Bentonville, AR

Sewer Line Project Rehabilitation
Results
England, AR

Construction of Sewer Interceptor Replacement
Infrastructure
Bidding
$300,000 est. value
Camden, AR

Cured in Place Pipe (CIPP)
Infrastructure
Post-Bid
Pine Bluff, AR

PLWC Basins 1-3-4 Manhole Rehabilitation
Results
Less than $603,200 est. value
Paragould, AR

Indian Hills Sanitary Sewer Improvements
Infrastructure
Bidding
$70,000 est. value
Greenwood, AR 72936

Arkansas Boulevard and Pinson Drive 12” Sewer Main Relocation
Infrastructure
Post-Bid
Texarkana, AR

Deans Trail Phase 2
Results
$2,300,000 to $2,400,000 est. value
Springdale, AR

Reported 07/01/2022 12:00 AM
Project Title

Septic Line Cleaning - Dardanelle Powerhouse

Physical Address View project details and contacts
City, State (County) Dardanelle, AR 72834   (Yell County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Request for Quotations, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish all necessary labor, materials, tools, equipment, supplies, supervision, inspection, testing and management required to perform work as described herein. This contract shall be to clean out and dispose of approximately 4,000 gal septic tank waste and to jet and camera approximately 400 ft of septic line to resume to a fully functional condition. 2.0 Location of work - Work will be performed on site at Dardanelle Power House (1022 Dardanelle Dam Road Dardanelle AR 72834) 3.0 Work Hours and Restrictions - All work shall be accomplished between the hours of 0700 and 1730, Monday through Thursday not including Federal Holidays. Access to the work sites must be arranged and approved no less than 48 hours in advance; photo identification must be provided upon arrival and prior to accessing the facility. 4.0 Commencement, Prosecution and Completion of Work - The contractor shall be required to commence work upon award or issuance of the contract, prosecute the work diligently, and complete the entire work ready for use not later than 30 days after date of award. 5.0 Description/Specifications/Work Statement - Pump out and dispose of approximately 4,000 gal of waste from the septic tank inside the Dardanelle Power House. Clean out approximately 400 ft of septic line inside the Dardanelle Power House with a water jet, then use a camera to verify lines are clean and free of debris. Contractor submitted quote shall include all related expenses including but not limited to: Parts/Materials, Tools, Labor, Travel and Lodging if necessary

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents