Similar Projects
Residences at Pine Street
New Construction
Conception
Norfolk, MA 02056

Peach Street Sub-division
New Construction
Conception
Walpole, MA 02081

East Milton Square Mixed Use
New Construction - 18,800 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Milton, MA 02186

Willard Street Mixed-Use
New Construction - 3,800 SF
Design
Less than $1,500,000 est. value
Quincy, MA 02169

Elevator Maintenance and Repair Services
Alteration
Post-Bid
Quincy, MA

Renovate Bathrooms
Renovation
Post-Bid
$48,000 est. value
Canton, MA 02021

Balcony Repair, Kevin F. McGuire Housing
Renovation
Results
$178,850 est. value
Norwood, MA 02062

Vacancy Rehabilitation
Renovation
Results
$264,339 est. value
Quincy, MA 02169

Willows at Medway
New Construction - 11,472 SF
Construction
$60,310,000 est. value
Medway, MA 02053

Willows at Medway
New Construction - 11,472 SF
Construction
$60,310,000 est. value
Medway, MA 02053

The Overlook
New Construction, Renovation
Pending Verification
$4,849,530 est. value
Weymouth, MA

Front Street Mixed Use
New Construction
Pending Verification
Weymouth, MA 02188

Plymouth Rubber Redevelopment Buildings 5 & 6
New Construction - 650,480 SF
Conception
Canton, MA 02021

Massapoag Street Homes
New Construction
Design
Weymouth, MA 02190

Modernization Of Sussman Apartments
New Construction, Renovation
Post-Bid
Brookline, MA 02446

Last Updated 04/27/2022 12:43 PM
Project Title

Timber Crest Estates

Physical Address View project details and contacts
City, State (County) Medway, MA 02053   (Norfolk County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums, Single-Family Homes
Contracting Method Owner to Subcontract.
Project Status Construction Commenced February 2021, Construction Completion Expected first quarter 2025
Bids Due View project details and contacts
Estimated Value $61,448,981
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

136 Single-Family Homes, New Construction, 58 Apartments/Condominiums, New Construction 2 Units per Building, 595 Parking Spaces, 163 Acres.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 14 - Conveying Equipment.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents