Similar Projects
Old Peachtree Road Tract
New Construction
Conception
Lawrenceville, GA 30043

Rivers Edge
New Construction - 938,400 SF
Conception
$10,000,000 CJ est. value
Dacula, GA 30019

Buford Highway Townhomes
New Construction
Design
Norcross, GA 30071

Exchange at Gwinnett Apartments
New Construction
Design
Buford, GA 30519

Temple Tract Development
Results
Sugar Hill, GA

The Sheridan at Eastside
New Construction - 164,000 SF
Construction
$22,000,000 est. value
Snellville, GA

Avonlea Pointe Apartments
New Construction - 361,456 SF
Construction
Duluth, GA 30096

Apartment Project
New Construction
Pending Verification
Lawrenceville, GA

CPC Mall of Georgia
New Construction
Pending Verification
Buford, GA 30519

Manor Lake Hamilton Mill
New Construction - 66,529 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Buford, GA 30519

Exchange at Gwinnett Senior Living
New Construction
Design
Buford, GA 30519

Wisteria Place at Hamilton Mill
New Construction - 125,000 SF
Construction
$10,000,000 CJ est. value
Buford, GA 30519

Arnold Mill Road
New Construction
Pending Verification
Lawrenceville, GA

Westplan @ Peachtree Industrial Boulevard
New Construction
Conception
Norcross, GA 30092

Norcross Gateway
New Construction - 179,300 SF
Design
$10,000,000 CJ est. value
Norcross, GA

Last Updated 02/24/2021 10:51 AM
Project Title

Collections at Wolf Creek - Phase 2

Physical Address View project details and contacts
City, State (County) Lawrenceville, GA   (Gwinnett County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Builder to Subcontract.
Project Status Construction Documents, Construction Start Expected May 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

9 Apartments/Condominiums, New Construction 39 Unit(s), 6.88 Acres.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents