Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Westwood Subdivision Site Development
New Construction
Design
Thornton, CO 80602

Request for Contractor Prequalifications
Renovation, Infrastructure
Bidding
Thornton, CO

RFP Engineering - Riverdale Regional Park Collaboration and Operations
Infrastructure
Bidding
$200,000 CJ est. value
Byers, CO 80103

2022 Water System Improvement
Post-Bid
Aurora, CO

2022 PRV Vault Improvement
Post-Bid
Aurora, CO

Notice of Request for Contractor Qualifications
Term Contract
Results
Thornton, CO 80229

Notice of Request for Contractor Qualifications
Term Contract
Results
Thornton, CO 80229

Fitness Center - Site Improvements
Infrastructure
Construction
Commerce City, CO 80022

Service Street
New Construction, Infrastructure
Conception
Thornton, CO 80023

Reunion Ridge Filing 2 and 3 Improvements
Infrastructure
Bidding
$11,000,000 est. value
Commerce City, CO

Civil Site Work IDIQ for Interior Region 8
Post-Bid
$25,000 to $500,000 est. value
Glendale, Yuma, AZ

Design-Build Services I-70/Picadilly Interchange
Results
$37,000,000 to $43,000,000 est. value
Aurora, CO 80012

Gateway Center Filing 7 Phases 1 and 2
Post-Bid
Denver, CO 80239

Last Updated 08/05/2022 08:32 AM
Project Title

Lake Mary Trail Paving Phase 2

Physical Address View project details and contacts
City, State (County) Commerce City, CO 80022   (Adams County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project Name: Lake Mary Trail Paving Phase 2 Station Name: Rocky Mountain Arsenal NWR 1. 100% Small Business Set-aside, NAICS Code 238110 Poured Concrete Foundation and Structure Contractors, Size Standard $16.5M. This solicitation is a request for proposal and awarded as a firm-fixed price construction contract. 2. IAW FAR 36.204 the magnitude of this construction project is anticipated to be between $250,000 and $500,000. 3. Contractors shall follow instruction in section L of the solicitation. 4. Any request for information or request for a site visit must be received no later than 25 July 2022 via e-mail at miguel_martinez@fws.gov by 12:00 PM MST. 5. Proposals must be received via e-mail to Miguel Martinez at miguel_martinez@fws.gov no later than 4 August 2022 by 5:00 PM MST. Project Name: Lake Mary Trail Paving Phase 2 Station Name: Rocky Mountain Arsenal NWR 1. 100% Small Business Set-aside, NAICS Code 238110 Poured Concrete Foundation and Structure Contractors, Size Standard $16.5M. This solicitation is a request for proposal and awarded as a firm-fixed price construction contract. 2. IAW FAR 36.204 the magnitude of this construction project is anticipated to be between $250,000 and $500,000. 3. Contractors shall follow instruction in section L of the solicitation. 4. Any request for information or request for a site visit must be received no later than 25 July 2022 via e-mail at miguel_martinez@fws.gov by 12:00 PM MST. 5. Proposals must be received via e-mail to Miguel Martinez at miguel_martinez@fws.gov no later than 4 August 2022 by 5:00 PM MST. Legacy Doc #: FWS Delivery: 11/30/2022 Delivery Location Code: 0008350044 FWS ROCKY MTN ARSNL NWR 6550 GATEWAY ROAD, BLDG 121 COMMERCE CITY CO 80022-1748 US Period of Performance: 09/01/2022 to 12/01/2022 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents