Similar Projects
Lincoln Trail - 325049 - City of Cedar Rapids
Infrastructure
Conception
$1,957,000 CJ est. value
Cedar Rapids, IA 52401

Industrial Park Expansion (Phase I) - 5 - City of Cedar Falls
Alteration
Conception
$6,000,000 est. value
Cedar Falls, IA 50613

Seerley Park Renovation - 150 - City of Cedar Falls
Infrastructure
Design
$300,000 CJ est. value
Cedar Falls, IA 50613

Main Street Reconstruction - City of Cedar Falls
Infrastructure
Design
$12,025,000 est. value
Cedar Falls, IA 50613

RFQ Construction Manager At Risk - Hawkeye Community College - Butler Hall Addition and Renovation
Addition, Renovation, Infrastructure
Bidding
$4,000,000 CJ est. value
Waterloo, IA 50701

McFarlane Park Septic System Replacement
Infrastructure
Post-Bid
$50,000 CJ est. value
La Porte City, IA 50651

Strayer-Wood Theater Loop Drive and Pavement Repairs and Maintenance on Panther Parkway
Infrastructure
Post-Bid
$395,000 est. value
Cedar Falls, IA 50614

Black Hawk Park Shower Facility Improvements
Renovation
Results
$78,983 CJ est. value
Cedar Falls, IA 50613

West 27th Street Reconstruction Project
Infrastructure
Results
$7,365,463 est. value
Cedar Falls, IA 50614

Cedar Heights Drive Reconstruction - 111 - City of Cedar Falls
Infrastructure
Construction
$7,173,000 CJ est. value
Cedar Falls, IA 50613

Cedar Heights Drive Reconstruction - 111 - City of Cedar Falls
Infrastructure
Construction
$7,173,000 CJ est. value
Cedar Falls, IA 50613

Gibson Property Development - Phase lll-V - City of Cedar Falls
New Construction, Infrastructure
Pending Verification
$1,400,000 CJ est. value
Cedar Falls, IA 50613

Union at North Crossing
New Construction, Infrastructure
Pending Verification
$68,000,000 CJ est. value
Waterloo, IA 50703

Downtown Lot Improvements - City of Cedar Falls
Infrastructure
Conception
$300,000 CJ est. value
Cedar Falls, IA 50613

Residence Inn by Marriott / Cedar Falls
New Construction, Infrastructure - 21,530 SF
Design
$6,500,000 CJ est. value
Cedar Falls, IA 50613

Last Updated 10/16/2023 09:47 PM
Project Title

FY 2024 Byrnes Aquatic Center

Physical Address View project details and contacts
City, State (County) Waterloo, IA 50701   (Black Hawk County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Paving/Reconstruction, Site Development, Swimming Pool(s)
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the removal and replacement of the existing pool and pool pump house with new aquatic facilities. The existing bath house will be renovated and include upgrades to the building entry, guard area, restroom / locker rooms, and concessions. The project includes earthwork, new site paving to support the new facility, landscape enhancements, and updates to site utilities. Optional paper copies of the Plans and Specifications are available from INVISION Architecture, 501 Sycamore Street, Suite 101, Waterloo, Iowa, upon receipt of a $150.00 deposit (CHECK ONLY). Deposits are fully refundable if the plans and specifications are returned in usable condition (i.e., generally free of highlights, ink markings, tears, stickers, water stains and soiling) to the Waterloo AECOM office listed above by the end of the 14th consecutive day after the award of the contract. No deposits will be refunded for any requests or plans received after the 14th consecutive day, which includes plans returned via mail service. Plan holders are responsible for ascertaining when the project has been awarded. If the plan holder is the prime contractor, or a subcontractor or supplier of the prime contractor that has been awarded the project, Plans and Specifications do not need to be returned to receive the deposit. The prime contractor must submit a list of his subcontractors and suppliers for the City and consulting engineer to verify eligibility for the refundable deposit. The City reserves the right to reject any or all bids. The Council of said City will conduct a public hearing on the proposed plans, specifications, form of contract, and estimate of cost for the construction of the above-described improvement project at 5:30 p.m. on November 6th, 2023, said hearing to be held in the Harold E. Getty Council Chambers in City Hall in said City. A goal of at least ten percent (10%) for MBE participation on all City funded construction projects that are estimated at $50,000.00 or more. A goal of at least two percent (2%) for WBE participation on all City funded construction projects that are estimated at $50,000.00 or more. Any project funded in part or in total with federal funds shall follow the respective agencies contract compliance program and goals LIQUIDATED DAMAGES :Time is an essential element of this contract. It is important that the work be diligently pursued to completion. If the work is not completed within the specified contract period, plus authorized extensions, the contractor shall pay to the City Liquidated Damages in the amount of one thousand dollars ($1,500.00) per day, for each day, as further described herein, in excess of the authorized time.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting, Special Coatings, Cementitious Coatings.
Division 12 - Furnishings.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Special Purpose Lighting, Underwater Lighting.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents