Similar Projects
Last Updated | 01/04/2023 03:12 PM |
Project Title | Southwest Campus - Buildout of 500 Building for APCo HVAC Program |
Physical Address | View project details and contacts |
City, State (County) | Mobile, AL 36603 (Mobile County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected May 2022 |
Bids Due | View project details and contacts |
Estimated Value | $300,000 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Work of the project includes, but is not limited to, selective demolition, new construction, coordination and supervision of the entire project, and all related work, as indicated in the Bid and Contract Documents. A cashier's check or bid bond payable to BISHOP STATE COMMUNITY COLLEGE in an amount not less than five (5) percent of the amount of the bid, but in no event more than $10,000, must accompany the bidder's proposal. Performance and statutory Labor and Material Payment Bonds, insurance in compliance with requirements, and verification of E-Verify enrollment will be required at the signing of the Contract. Contractors are encouraged to use the digital plans. Refunds will be issued for printed sets only issued by the Architect to each general contract bidder on the first two (2) sets issued submitting a bonafide bid, upon return of documents in good and reusable condition within ten (10) days of bid date. Additional sets for General Contractors, and sets for subs and vendors, may be obtained with the same deposit, which will be refunded as above, less cost of printing, reproduction, handling and distribution, which is estimated to be the same as the deposit amount. Contractors are encouraged to use the digital plans. Refunds will be issued for printed sets only issued by the Architect to each general contract bidder on the first two (2) sets issued submitting a bonafide bid, upon return of documents in good and reusable condition within ten (10) days of bid date. All bidders bidding in amounts exceeding that established by the State Licensing Board for General Contractors must be licensed under the Provision of Title 34, Chapter 8, Code of Alabama, 1975, as amended, and must show such evidence of license before bidding or bid will not be received or considered by Architect or Owner. The bidder shall show such evidence by clearly displaying his or her current license number on the outside of the sealed envelope in which the proposal is delivered; Bidder must also include his or her current license number on the Proposal Form. No bid may be withdrawn after the scheduled closing time for receipt of bids for a period of sixty (60) days. This project is being bid, under the provisions of Alabama Act 2000-684, which require the General Contractor, in part, to take advantage of the Owner's tax exempt status, obtain necessary certificates and other documentation required from the Alabama Department of Revenue, make payment for all materials, and to administer the sales and use tax savings portion of the project, as a part of their Bid. Additional qualifications and requirements for General Contractor Bidders and separate Subcontractors are indicated in the Bid and Contract Documents. The Owner reserves the right to reject any or all proposals and to waive technical errors if, in their judgment, the best interests of the Owner will thereby be promoted. 1. Existing site conditions and restrictions on use of the site. 2. Demolition of existing improvements,where indicatedandas otherwise requiredto accommodate the new Work; and all related work. 3. Buildout of 500 building for APCo HVAC program, etc., on the Southwest Campus Building 500; connections to existing improvements,temporaryprotections, andall related work. 4. Plumbing, mechanical and electrical systems, and all related work; Refer to Mechanical and Electrical Drawings for mechanical and electrical work related to this building and existing construction; 5. Site maintenance, to include daily clean-up or all work areas, coordination with Owner's requirements for removal and disposal of trash and construction debris. 6. Coordination of the Work of the entire project, including in part, with the BSCC Facility Director, Southwest Campus Director and security requirements, and with other contractors working on the site. |
||||||||||||||||||||||||||||||||||||||
Details | College/University, Approximately 4,268 SF Build-Out.
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |