Similar Projects
Sabal Palm Village at Flagler Trail
New Construction, Build-Out - 500,000 SF
Conception
$10,000,000 CJ est. value
Miami, FL

Brickell Gateway Tower
New Construction - 854,902 SF
Conception
$150,000,000 est. value
Miami, FL

One Island Park
New Construction - 5,000 SF
Design
$10,000,000 CJ est. value
Miami Beach, FL

MCID-2
New Construction, Renovation, Build-Out - 1,141,800 SF
Design
$10,000,000 est. value
Miami, FL

Publix #1229 / Homestead
New Construction, Infrastructure - 42,006 SF
Bidding
$10,000,000 CJ est. value
Homestead, FL 33030

Publix #1229 / Homestead
New Construction, Infrastructure - 42,006 SF
Bidding
$10,000,000 CJ est. value
Homestead, FL 33030

Publix #1770 - Riviera Plaza / Coral Gables
New Construction, Infrastructure - 52,363 SF
Post-Bid
$10,000,000 CJ est. value
Coral Gables, FL 33146

Publix #1770 - Riviera Plaza / Coral Gables
New Construction, Infrastructure - 52,363 SF
Post-Bid
$10,000,000 CJ est. value
Coral Gables, FL 33146

North Cruise Boulevard Extension Phase III
Results
Less than $11,834,424 est. value
Miami, FL

Racetrack Water Tower Booster Pump Station
New Construction
Results
$750,000 est. value
Homestead, FL 33035

Miami River
New Construction - 3,678,706 SF
Construction
Less than $310,000,000 est. value
Miami, FL

Canal Park West Tower
New Construction - 453,011 SF
Construction
North Miami Beach, FL

Beckham's Miami Freedom Park - United Major League Soccer Stadium
New Construction, Infrastructure - 1,000,000 SF
Pending Verification
$1,000,000,000 CJ est. value
Miami, FL 33125

Beckham's Miami Freedom Park - United Major League Soccer Stadium
New Construction, Infrastructure - 1,000,000 SF
Pending Verification
$1,000,000,000 CJ est. value
Miami, FL 33125

Stellar Golden Glades
New Construction, Demolition
Conception
$1,000,000 to $5,000,000 CJ est. value
Miami, FL

Last Updated 09/28/2022 02:39 PM
Project Title

Maurice Gibb Memorial Park

Physical Address View project details and contacts
City, State (County) Miami Beach, FL 33139   (Miami-Dade County)
Category(s) Commercial, Heavy and Highway, Sewer and Water
Sub-Category(s) Dock/Pier/Marine, Lift and Pump Stations, Office, Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $4,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Maurice Gibb Memorial Park is located at 1700 Purdy Avenue in Miami Beach. On October 19, 2012, petroleum contamination was identified during excavation work in the southeast corner of Maurice Gibb Park. As a result, Miami Dade County required the City to fully delineate the soil and groundwater contamination on the park property and to remediate areas with elevated contaminant levels A renovation of the park became necessary as soil remediation is required over most of the park's surface. The City developed a new design for the park with input from the community, which details the layout of the park elements, including the playground equipment, new plant material, earthwork, new signage, and new park furnishings. The design provided new uses such as a Fishing Pier, an Overlook, a Dog Park, and picnic areas that will increase recreational activities within the park. The new design also includes raising the existing seawall and extending the living shoreline to address sea level rise concerns. The park area will also be raised to address the environmental condition. A renovation of the park became necessary as soil remediation is required over most of the park's surface. The City developed a new design for the park with input from the community, which details the layout of the park elements, including the playground equipment, new plant material, earthwork, new signage, and new park furnishings. The design provided new uses such as a Fishing Pier, an Overlook, a Dog Park, and picnic areas that will increase recreational activities within the park. The new design also includes raising the existing seawall and extending the living shoreline to address sea level rise concerns. The park area will also be raised to address the environmental condition. The project receives funding from the Florida Inland Navigation District (FIND) and shall be subject to all the grant requirements. Q and A deadline: Sep 16, 2022 5:00:00 PM EDT

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Selective Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Sanitary Sewerage Utilities, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents