Similar Projects
Phase 4 - Tower Terrace Road from C Avenue to W/o Barnsley Lane
Conception
$6,400,000 est. value
Cedar Rapids, IA 52407

Mount Vernon Road South East 14th to 20th
Conception
$5,400,000 est. value
Cedar Rapids, IA 52407

Hawkeye Wildlife Unit North Road and Babcock Access Road Maintenance
Infrastructure
Bidding
$190,000 est. value
Oxford, IA

Pavement Preservation, Nine Eagles State Park
Infrastructure
Bidding
$200,000 est. value
Davis City, IA 50065

Street Repair Retainer
Term Contract, Infrastructure
Post-Bid
West Des Moines, IA

PCC Pavement Patching
Infrastructure
Post-Bid
IA

Edgewood Road NW from Ellis Road to Cedar River Bridge Pavement Rehabilitation
Results
$1,380,000 est. value
Cedar Rapids, IA 52407

Middle Road Rehabilitation
Infrastructure
Results
Bettendorf, IA

32nd Street North East from Carlisle Street through Oakland Road Pavement Reconstruction
Conception
$2,000,000 est. value
Cedar Rapids, IA 52402

2022 Street Improvements
Infrastructure
Bidding
$850,000 est. value
Algona, IA

Proposed Street Improvements
Infrastructure
Post-Bid
Less than $2,282,000 est. value
Bloomfield, IA

Hickory Grove Road Resurfacing, North Pine Street North to end of HMA overlay
Infrastructure
Results
Davenport, IA 52805

2022 Street Resurfacing
Infrastructure
Bidding
$400,000 est. value
Allison, IA

Eldridge SRF Water Quality Improvements - Permeable Pavement Alleyway
Infrastructure
Post-Bid
Eldridge, IA

East 2nd Street Reconstruction from East Court Avenue to Iowa Interstate Railroad
Infrastructure
Results
$1,177,500 est. value
Des Moines, IA

Last Updated 04/21/2022 03:46 AM
Project Title

Richland St - PCC Pavement - Replace

Physical Address View project details and contacts
City, State (County) Storm Lake, IA   (Buena Vista County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In The City Of Storm Lake, On e Richland St., From Industry St East 600 Feet To Radio Road 26.00 Each Aprons 4,697.00 Cubic Yard Compaction With m & d Control 600.00 Linear Foot Culvert Pipe 243.00 Square Yard Drives, p.c.c. 70.00 Square Yard Engineering Fabric 10,940.00 Cubic Yard Excavation Class 13 415.30 Cubic Yard Excavation Class 20 152.90 Ton Granular Shoulders, Type a 7.00 Each Intakes & Manholes/Utility Access 846.00 Cubic Yard Modified Subbase 22.00 Each Patches By Count 1,139.00 Square Yard Patches, Full-Depth 217.00 Square Foot Patches, Partial-Depth p.c.c. 4,354.20 Square Yard Pavement, p.c.c. 1.00 Lump Sum Pipe Lining 4,242.90 Square Yard Removal Of Pvmnt/Drives/Sdwk 50.00 Ton Revetment 3.28 Acre Seeding & Fertilizing 287.00 Linear Foot Sewer Sanitary 707.00 Linear Foot Sewer, Storm 8.10 Station Shoulder Construction 2,407.00 Linear Foot Silt Fence 384.00 Square Special Ditch Control 1,982.00 Linear Foot Subdrain 160.00 Ton Surfacing, Crushed Stone 3,969.00 Cubic Yard Topsoil, Strip/Salvage/Spread 941.00 Linear Foot Water Main

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents