Similar Projects
The Reserve Restaurant & Urgent Care Veterinary Clinic
New Construction - 17,960 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Wyoming, MI 49418

Hyatt Place Hotel
New Construction
Conception
Kentwood, MI 49512

Banquet Hall
Renovation
Design
Grand Rapids, MI 49507

Aloft Hotel and Towneplace Suites - Joint Hotel
New Construction - 110,498 SF
Design
$30,000,000 est. value
Grand Rapids, MI 49544

Chick-Fil-A #4599
New Construction - 4,988 SF
Post-Bid
Walker, MI 49534

Target #T0397 - Cafe Remodel
Renovation - 1,170 SF
Post-Bid
Walker, MI 49544

415 Franklin Apartments
Renovation - 74,520 SF
Construction
$16,000,000 est. value
Grand Rapids, MI 49507

Amway Grand Plaza Hotel Tower
Renovation
Construction
$40,000,000 est. value
Grand Rapids, MI 49503

Covenant Christian High School - Athletic Field Improvements
New Construction, Renovation - 960 SF
Pending Verification
Less than $500,000 CJ est. value
Grand Rapids, MI 49534

Tropical Smoothie MI-102 Kentwood
New Construction
Pending Verification
Kentwood, MI 49512

Malph's Pizza Pub
Renovation
Design
Rockford, MI 49341

Starbucks #66570
New Construction, Build-Out - 2,240 SF
Post-Bid
$500,000 to $1,000,000 CJ est. value
Walker, MI 49534

Kusterer Brauhaus
Renovation - 3,460 SF
Construction
Grand Rapids, MI 49504

Pizza Hut
Renovation - 1,500 SF
Pending Verification
Wyoming, MI 49519

Dunkin Donuts
New Construction - 2,464 SF
Design
$500,000 to $1,000,000 CJ est. value
Wyoming, MI 49519

Reported 04/11/2022 12:15 PM
Project Title

Ada House

Physical Address View project details and contacts
City, State (County) Ada, MI 49301   (Kent County)
Category(s) Commercial
Sub-Category(s) Food/Beverage Service, Hotel/Motel
Contracting Method
Project Status Construction Commenced February 2022, Construction Completion Expected third quarter 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Hotel/Motel, 3 Stories Above Grade, 37,000 SF New Construction, 24 Unit(s), Food/Beverage Service.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Refrigerated Display Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Countertops, Furnishings and Accessories, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Hospitality Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents