Similar Projects
Low Bid Design Build River Rd From US 41 to I-75, Sarasota Co
Bidding
Less than $65,036,629 est. value
FL

Resurfacing FY21, Increment 3
Bidding
Sarasota, FL

Morgan's Glen Phases 1 and 2 (Site Civil) and Phase 3 (Earthwork)
Post-Bid
Sarasota, FL

Resurface Two Streets
Post-Bid
Bradenton, FL 34208

Myrtle Street Improvements, Phase 3
Results
Less than $2,536,473 est. value
Sarasota, FL 34234

Uihlein Road Phase 3 Roadway with SR-64 Turn Lanes
Results
Sarasota, FL 34230

Cattlemen Road Improvements, Phase II
Bidding
$5,998,050 est. value
Fruitville, Sarasota, FL 34235

Construction Services
Post-Bid
FL

North River Ranch Phases 1B and 1D East
Results
Sarasota, FL 34230

Morgan`s Glen Phases IB, IC, IIB, and IIIB
Bidding
Sarasota, FL

Civil/Site Construction Services
Post-Bid
FL

Academic Avenue and Lightwood Trail Roadway Improvements Project
Results
$2,780,894 est. value
Lakewood Ranch, FL 34202

Civil/Site Construction Services
Post-Bid
FL

44th Avenue East Extension Project - from 45th Street East to I-75
Results
Bradenton, FL 34205

Civil/Site Construction Services
Post-Bid
FL

Last Updated 04/01/2021 10:17 AM
Project Title

Parking Lot Expansion Phase 2

Physical Address View project details and contacts
City, State (County) Sarasota, FL 34243 (Manatee, Sarasota Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project will expand landside parking facilities at SRQ and includes two elements. The first element will expand the Long-Term Lot to the south, adding approximately 140 parking spaces. Additional lighting, security, cameras, and shuttle shelters will be included in this element. The second element will improve the Shade Lot overflow parking area, adding 204 asphalt paved parking spaces. Additional lighting, landscape, and security will be included in this element.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents