Similar Projects
Southern Pump Station Project
Infrastructure
Bidding
$6,200,000 est. value
El Centro, CA 92244

Drilling and Construction of Well 32 and 33 Project
Infrastructure
Bidding
Colton, San Bernardino, CA 92324

Groundwater Treatment Plant Design-Build (Phase B)
New Construction, Infrastructure
Post-Bid
Anaheim, CA

CA-Stone Lakes NWR-Pumps Rehab
Term Contract
Post-Bid
Elk Grove, CA

Grayson Well 69 (Replacing Well 274)
Infrastructure
Results
$2,449,000 est. value
Grayson, Modesto, CA 95363

Treated Water Booster Pumps
Alteration
Results
CA

Well and Pump Maintenance and Repair
Infrastructure
Bidding
$114,000 est. value
Napa, Suisun City, CA 94585

Well Pumping Plant 31, Fogg Street
Infrastructure
Post-Bid
$1,600,000 to $1,800,000 est. value
Colton, CA 92324

Groundwater Flush to Waste Project
Infrastructure
Results
Sacramento, CA 95838

Construction of Well 18
Alteration
Bidding
$450,000 est. value
Winton, CA

Plumas National Forest Brush Creek Fuel Pump Repair
Term Contract
Post-Bid
$25,000 to $100,000 est. value
Berry Creek, CA 95916

Chilled Water Pump Project
Infrastructure
Results
Marysville, CA 95901

Beneta Well No. 2 - Phase 1 Drilling
Infrastructure
Bidding
$1,400,000 to $1,500,000 est. value
Tustin, CA 92780

Martin Slough Flow Enhancement Project
Alteration
Post-Bid
Eureka, CA 95503

Well Abandonment Project
Infrastructure
Results
Riverside, CA 92519

Last Updated 10/15/2021 08:16 AM
Project Title

Seasons Well (W-41) Pump Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Sacramento, CA   (Sacramento County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $110,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed under this contract includes the furnishing of all labor, materials, and equipment to rehabilitate the well at Seasons Well (W-41) and other incidental work, The rehabilitation includes, but is not limited to, removing the pump, well video, cleaning of the well, sourcing and installing a replacement submersible pump and installing two sounding tubes.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents